Version:  Allplan 2019  | Last modified: 12.11.2018
Not voted yet. Be the first to vote this FAQ as helpful!

Information:

This document provides further information on installing Allplan 2019.

Backing up and archiving data:

We strongly recommend that you back up and archive all your data before you upgrade to Allplan 2019.


How to install


You can find detailed instructions on how to install Allplan 2019 in the following places:

- After you have downloaded and unzipped Allplan 2019, you can find the ‘install.chm’ file in the following folder: C:\Users\Public\Documents\Allplan 2019\HelpFiles\English.

- Use the following link:
https://webdrive.allplan.com/s/4LrjrymoxESzC6p and open the General\Installation help\2019 folder.


Please read these instructions before you install Allplan 2019.

System requirements for Allplan 2019

https://connect.allplan.com/en/faqid/20180608093815.html

How to handle licenses when upgrading to Allplan 2019

https://connect.allplan.com/en/faqid/20180608092654.html



Some notes on installing Allplan 2019

If you want to switch from Allplan 2016/2017/2018 to Allplan 2019, you can choose between three installation options. We recommend using the second option: first-time installation and copy data from Allplan 2016/2017/2018.

1. First-time installation

This option installs Allplan 2019 to a new folder without affecting any other Allplan installation (2018 or earlier). Setup does not transfer any data or settings to the new installation.

If you want to transfer data later, you have the following options:

You can uninstall Allplan 2019 and then upgrade from Allplan 2016/2017/2018.
You can integrate the data manually (requires administrative knowledge).

2. First-time installation and copy data from version

This option installs Allplan 2019 to a new folder without affecting any other Allplan installation (2018 or earlier). You can configure Setup to automatically copy the office standard (\std), projects (\prj) and user data (\usr) from Allplan 2016/2017/2018 to the new installations folder.
This duplicates the data: You can use all projects, defaults and resources both in Allplan 2018 and in Allplan 2016/2017/2016. This way, you can test the new version without losing your 'old' Allplan version.
Bear in mind, though, that you should not mix data from different versions. Merging data later involves considerable time and effort.

2a. Continue with first-time installation and copy data from version

This option is available when you have already used the second installation option to install <Product_Version> to a computer that accesses the same data server. As a result, the data are already available.

3. Upgrade and transfer data from Allplan 2016/2017/2018

This option installs Allplan 2019 to an existing folder, converting Allplan 2016/2017/2018 to Allplan 2019 and transferring all important settings. Afterwards, you can no longer work with Allplan 2016/2017/2018.
This does nor affect earlier Allplan versions (Allplan 2015 or earlier).


Installing on a network:

  • If you work in a network environment (one common central file storage folder), you must upgrade all workstations to Allplan 2019. Beforeyou start installing, make sure that all workstations can be upgraded. For technical reasons, it is not possible to mix installations of different major releases. Any related problems area not covered by service contracts.
  • During the upgrade, Allplan 2016/2017/2018 must not be running on any workstation.
  • When installing with Workgroup Manager, make sure all workstations are checked in before you start upgrading.





Converting the data:

Data from earlier Allplan versions need to be converted to version 2019. Allplan 2019 automatically converts the data of a project you open. Click here for instructions on how to convert all projects in a single operation:

https://connect.allplan.com/en/faqid/20090408124904.html


IBD 2019

Click here for instructions on how to get your activation codes for Allplan IBD:

https://connect.allplan.com/en/faqid/20110912113530.html

Download PDF  FAQ_EN_Hotletter_2019.pdf
Version:  Allplan 2019 / Allplan 2018 / Allplan 2017 / Allplan 2016 / Allplan 2015 / Allplan 2014 / Allplan 2013  | Last modified: 20.09.2018
12 user(s) found this FAQ helpful

Question:

A new computer is to replace the existing one.
How can I transfer the existing data and settings of the existing Allplan installation to the new computer?



Solution:

Please note that this solution only works with stand-alone versions.
Install the same version of Allplan on the new computer and transfer the data as follows:

1st - transferring the data:
Transfer the following folders from the old computer to the new one:
Project folder (PRJ)
Office standard folder (STD) and
User folder (USR)

You can determine the path to these folders on both the new computer and the old computer as follows:
Services application->Service->Hotline Tools->Showcfg: shows system variables ->OK
You can find the paths to the folders after PRJ, STD and USR.

2nd - transferring the toolbar configuration:
Export the configurations from the old computer by clicking View -> Toolbars -> Customize... -> Export...
You can then import the configurations to the new computer by clicking View -> Toolbars -> Customize... -> Import...

Download PDF  FAQ_EN_Installation_on_a_new_computer_with_data_tran...
Version:  Allplan 2019 / Allplan 2018 / Allplan 2017 / Allplan 2016 / Allplan 2015 / Allplan 2014 / Allplan 2013 / Allplan 2012  | Last modified: 22.08.2019
1 user(s) found this FAQ helpful

Task:

You have installed Allplan on several local workstations. Now you want to change the installation so that you can access a common network drive.



Note:

Before you switch to a network installation, it is essential that you back up all the data of all the workstations.
We strongly recommend that you take advantage of the expertise of Nemetschek’s technical support staff. We are happy to help you!



Solution:

The following description shows how to change several workstations where Allplan is installed locally and the project data is also stored locally on each computer to workstations with a common network drive without Workgroup Manager.

1st - getting ready
Choose one of the workstations where you will install all the projects and the office standard (hereinafter referred to as the main workstation).
First, move all the projects to the main workstation.

1.a: copying resources into projects
To make sure that the projects in your office have a uniform appearance, change the path settings for the projects' resources to 'Project'.
Make the following setting for each project:
Allplan -> File menu -> ProjectPilot - Admin -> select the individual projects one after the other -> right mouse button -> Properties -> Settings tab
Set the path settings for 'Pen and line definitions', 'Fonts', 'Patterns, hatching styles, area styles', 'Bar and mesh cross-section catalogs', 'Layer structures, line styles, drawing types' and 'Attributes proposed' from 'Office' to 'Project', if necessary.
The corresponding elements are copied from the office standard directly to the project. This ensures that the project settings stay the same even when you copy the project to the new server with the new office standard.

1.b: same folder name as project name
Open the 'General' tab and select the 'Same folder name as project name' setting if you want to proceed as described in 2b.

1.c: pen color ("Color stands for pen")
The pen color for the "Color stands for pen" setting is a user-specific setting that is not saved in the project but in the user folder (...\Usr).

2.a: backing up projects of the individual workstations and importing them to the main workstation (recommended method):
Back up the individual projects. To do this, open the Services application and select Data Backup -> Create -> Entire folders -> Projects.
You can back up several projects in a single operation.
Before you start, specify the backup folder on the network or on the local hard disk: Services application -> Configuration -> Backup path ->Browse for Folder.

The next step is to import the saved projects to the main workstation.To do this, open theServices application -> Data Backup -> Import -> Projects Before you import the individual projects, you can create new Allplan projects at the main computer. As an alternative, you can also create a new project during the import.

2.b: backing up projects of the individual workstations and importing them to the main workstation (special approach):
This approach should only be used with good reason for exceptional cases as it requires in-depth knowledge of Windows.
With this method, Windows Explorer is used to import the projects to the main workstation.
If some project names exist twice, you need to rename these projects before you back them up.

You can then rename the existing 'project.dat' file in the Prj folder of the main workstation.
Next, select the Services application -> Service -> Hotline Tools -> reorg -> Restore project management file.
The system creates a new project administration file (project.dat), which should list all projects with names.

Now the main workstation contains the latest version of all the projects of the office.

3rd - merging project defaults
Open ProjectPilot at the individual workstations and copy the elements you want to transfer (symbols, smart symbols, lists, schedules, and so on) to the external path. Of course, you can set the external path to a common network folder that can be accessed by all workstations.
Next, open ProjectPilot at the main workstation and copy the contents of the external path to the office standard.

4th - data backup

  • Back up the projects, office standard and user settings at the main workstation:
    You can also copy the ..\prj (projects), ..\std (office standard) and ..\usr (user folder) paths to a backup folder (Nemsic, for example) on the hard disk.
  • In addition, you need to back up the ..\usr\local folder at every stand-alone computer.
  • Export the user interface setting of each user to a file: Allplan -> Tools - > Customize .... -> Export...


5th - uninstalling
Remove Allplan from all workstations.

6th - reinstalling
Before you install the same version again, create and share a folder (Nemdata, for example) on the future data server. Create a subfolder - Allplan - in this folder.

The next step is to reinstall the same version on all the workstations.

Specify the following installation paths:
Program folder:
local (C:\Programs\Nemetschek\Allplan, for example)
Central file storage folder:
Browse -> Network...
Find the sharedNemdata folder and select the Allplan folder.

After this, start installing.

7th - testing the start and restoring the backup
After the installation (check whether Allplan starts), copy the ..\prj and ..\std folders you backed up from the main workstation to the new ...\Nemdata\Allplan server folder.

Next, use Windows Explorer to copy the contents of the former user folder (…\usr\local) of the stand-alone workstation to the new user folder of the computer you just installed.

8th - updating the project administration file
Go to the project.datfile in the ...\Nemdata\Allplan\Prjfolder and rename itproject.alt.After this, do the following:
Services application -> Service -> Hotline Tools -> reorg -> Restore project management file.

9th - summary
Now all the workstations access a common network drive with the same project pool and office standard.
With this type of installation, only one user can access a project at any one time. If several users are to work on a project at the same time, you need to install Workgroup Manager.

Download PDF  FAQ_EN_Switching_from_single_installation_to_network...
Version:  Allplan 2019  | Last modified: 16.11.2018
Not voted yet. Be the first to vote this FAQ as helpful!

Question:
How can I work together on a project with a partner from another country?

Answer:
Using Allplan 2019 and later, you can work on projects across countries.
You can define projects in a country-specific manner. This means that a project gets the resources (for example, hatching, patterns, layers and so on) and reinforcement settings of a specific country. Depending on your license, you can install one or more additional country packages. For example, you can then create a project with resources and settings for Germany and another one with resources and settings for the UK.


Requirements:

Whether you can use country packages depends on the Allplan license.

Only the ‘Cubed’ and ‘Exponential’ license types include country packages.
These license types enable you to use as many country packages as you like. You can create and open projects with any country code.

The ‘Lineared’ and ‘Squared’ license types only include one country package by default. This also applies to all conventional license types such as ‘Architecture’ and ‘Engineering’. In other words, you can only create and open projects with this country code.

Installing country packages:

When installing Allplan 2019 for the first time or upgrading from Allplan 2018 or earlier, you must explicitly install the additional country packages.

A default installation onlyinstalls the country package of your country. If you want to use different country packages, you must do a custom installation. Only a custom installation allows you to select the country packages you want to install.
You can do this whenever you want - be it the first installation or an upgrade or update.

Doing a custom installation:
Start Setup.

Select Customfor the Setup type.
When it comes to selecting Features, you can select the language packages you want to install.
You can see a list of all Allplan languages included in your license.
After this, you can select the countries. Select the country packages you want to install.
Click ‘Next’ to confirm all other dialog boxes.

Note:Please note that the more country packages you select, the longer the installation will take and the more hard disk space will be required.

Using country packages in Allplan:

You must define the country when you create a project. You cannot change the country later.

Creating a new project:
When creating a new project, you can select the county in country-specific templates.
Select the country and the template you need.

If you do not select a project template, you must select the required country in the next dialog box.


In the project:
The status bar shows the country set for a project.
The units for length entries and reinforcement set in the Options are project-specific settings. These units are preset depending on the country selected.



Important note:
  • When checking out a project in a workgroup environment, you can choose which country-specific office standard you want to check out.
  • Click in the ‘License Settings’ to see which countries are included in your license.
  • There is a default country, which is usually the country entered in your license. Setup always installs the data for this default country in the STD and ETC folders. During installation, Setup creates a STD.??? folder and an ETC.??? folder for each additionalcountry package selected (??? stands for the country code). The office path and default path are always based on the country set for the project that is currently open. That is to say, when you open a project and save a favorite or library element in the office path or default path, these elements will only be available in projects with the same country settings. ProjectPilot is an exception; here, the office path and default path always refer to the STD and ETC folders.


Download PDF  FAQ_EN_Country-specific_projects_-_working_together_...
Version:  Allplan 2017  | Last modified: 09.10.2017
2 user(s) found this FAQ helpful

Information:

This document provides further information on installing Allplan 2017.

Backing up and archiving data:

We strongly recommend that you back up and archive all your data before you upgrade to Allplan 2017.


How to install:


You can find detailed instructions on how to install Allplan 2017 in the following places:

- After you have downloaded Allplan 2017, you can find the install.chm file in the Helpfiles\English folder.
- You can find the install.chm file on the Allplan 2017 DVD in the following folder: <DVD>:\programs\x64\Allplan\Helpfiles\English.

Please read these instructions before you install Allplan 2017.

Some notes on installing Allplan 2017

If you want to switch from Allplan 2014/2015/2016 to Allplan 2017, you can choose between three installation options. We recommend using the second option: first-time installation and copy data from Allplan 2014/2015/2016.

1. First-time installation

This option installs Allplan 2017 to a new folder without affecting any other Allplan installation (2016 or earlier). Setup does transfer neither data nor settings to the new installation.

If you want to transfer data later, you have the following options:

You can uninstall Allplan 2017 and then upgrade from Allplan 2014/2015/2016.
You can integrate the data manually (requires administrative knowledge).

2. First-time installation and copy data from Allplan 2014/2015/2016

This option installs Allplan 2017 to a new folder without affecting any other Allplan installation (2016 or earlier). You can configure the program to automatically copy the office standard (\std), projects (\prj) and user data (\usr) from Allplan 2014/2015/2016 to the new installations folder.
This duplicates the data: you can use all projects, defaults and resources both in Allplan 2016 and in Allplan 2014/2015/2016. This way, you can test the new version without losing your &apos;old&apos; Allplan version.
Bear in mind, though, that you should not mix data from different versions, as merging data later involves considerable time and effort.

2a. Continue with first-time installation and copy data from version

This option is available when you have already installed <Product_Version> and copied the data to a different computer that accesses the same data server. As a result, the data have already been transferred.

3. Upgrade and transfer data from Allplan 2014/2015/2016

This option installs Allplan 2017 to an existing folder, converting Allplan 2014/2015/2016 to Allplan 2017 and transferring all important settings. Afterwards, you can no longer work with Allplan 2014/2015/2016.
This does nor affect earlier Allplan versions (Allplan 2013 or earlier).



Installing on a network:

  • If you work in a network environment (one common central file storage folder), you must upgrade all workstations to Allplan 2017. Therefore, make sure you can upgrade all workstations (deadline for Serviceplus agreement: July 1, 2016) beforeyou start installing.
  • During the upgrade, Allplan 2014/2015/2016 must not be running on any workstation.
  • When installing with Workgroup Manager, make sure all workstations are checked in before you start upgrading.



Converting data:

IBD 2017

IBD 2017 is expected to be released with the Allplan 2017-0-1 Hotfix at the end of July 2016.
https://connect.allplan.com/en/faqid/20160707142752.html


Download PDF  FAQ_EN_Hotletter_2017.pdf
1 - 5 (5)
  • 1
| A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z |
https://campus.allplan.com/ uses cookies  -  More information

Accept