Результат поиска

1 - 10 (10)
  • 1
Версия:  Allplan 2021 / Allplan 2020 / Allplan 2019 / Allplan 2018 / Allplan 2017 / Allplan 2016  | Последнее изменение: 01.10.2020 10:44
2 user(s) found this FAQ helpful

Question:

How can I import data from an earlier version?



Answer:

You can import data from the last three Allplan versions.
Consequently, the following import operations are possible:

Target version <- import possible from version

2017 <- 2014
2016 <- 2013
2015 <- 2012
2014 <- 2011
2013 <- 2009
2012 <- 2008
2011 <- 2006
2009 <- 2005
2008 <- 2004
2006 <- 2003
2005 <- 17
2004 <- 16

We cannot guarantee that data created in older versions can be imported and edited. The conversion of older data may be incomplete, which may affect intelligent components in particular.


1. Archived data from an earlier version (not older than three previous versions):

There are two ways to convert the data to the current version:

  • Import the project backups created and archived using the
    Services application -> Data Backup -> Import -> Projects.
    After importing the projects, convert them by opening each project once.
  • Import the backups archived using the
    Services application -> File -> Restore documents of any version to &apos;...\Extern&apos;.
    The data are written to the external path.
    You can now process the converted data in ProjectPilot.



2. Archived data from an older Allplan version (older than three previous versions):

  • See whether you can use the approach described in step 1 to import the old projects.
  • If available, it is a good idea to install an old Allplan version. Import the backups created and archived into this old version and convert the projects using the Services application. If you have imported a complete project backup, convert the data by opening each project once. When finished, repeat this process with a newer version (up to three versions later) until the data are up-to-date.
  • If an old Allplan version is not available, you can also have the data converted by Allplan. Please note that this service is not free of charge. Please contact Technical Support -> support.de@allplan.com.




Notes:

  • You can convert the data of all projects at once. Read the following FAQ in Allplan Connect: https://connect.allplan.com/en/faqid/20090408124904.html
  • If enough hard disk space is available, you are advised to keep and maintain the projects so that Allplan automatically converts them to the current version whenever you upgrade.
  • If there are project-specific smart symbol catalogs, you should open the smart symbol catalog once to convert the data.
Загрузка PDF  FAQ_EN_Transferring_data_from_old_Allplan_versions_....
Версия:  Allplan 2019  | Последнее изменение: 12.11.2018
Not voted yet. Be the first to vote this FAQ as helpful!

Information:

This document provides further information on installing Allplan 2019.

Backing up and archiving data:

We strongly recommend that you back up and archive all your data before you upgrade to Allplan 2019.


How to install


You can find detailed instructions on how to install Allplan 2019 in the following places:

- After you have downloaded and unzipped Allplan 2019, you can find the ‘install.chm’ file in the following folder: C:\Users\Public\Documents\Allplan 2019\HelpFiles\English.

- Use the following link:
https://webdrive.allplan.com/s/4LrjrymoxESzC6p and open the General\Installation help\2019 folder.


Please read these instructions before you install Allplan 2019.

System requirements for Allplan 2019

https://connect.allplan.com/en/faqid/20180608093815.html

How to handle licenses when upgrading to Allplan 2019

https://connect.allplan.com/en/faqid/20180608092654.html



Some notes on installing Allplan 2019

If you want to switch from Allplan 2016/2017/2018 to Allplan 2019, you can choose between three installation options. We recommend using the second option: first-time installation and copy data from Allplan 2016/2017/2018.

1. First-time installation

This option installs Allplan 2019 to a new folder without affecting any other Allplan installation (2018 or earlier). Setup does not transfer any data or settings to the new installation.

If you want to transfer data later, you have the following options:

You can uninstall Allplan 2019 and then upgrade from Allplan 2016/2017/2018.
You can integrate the data manually (requires administrative knowledge).

2. First-time installation and copy data from version

This option installs Allplan 2019 to a new folder without affecting any other Allplan installation (2018 or earlier). You can configure Setup to automatically copy the office standard (\std), projects (\prj) and user data (\usr) from Allplan 2016/2017/2018 to the new installations folder.
This duplicates the data: You can use all projects, defaults and resources both in Allplan 2018 and in Allplan 2016/2017/2016. This way, you can test the new version without losing your 'old' Allplan version.
Bear in mind, though, that you should not mix data from different versions. Merging data later involves considerable time and effort.

2a. Continue with first-time installation and copy data from version

This option is available when you have already used the second installation option to install <Product_Version> to a computer that accesses the same data server. As a result, the data are already available.

3. Upgrade and transfer data from Allplan 2016/2017/2018

This option installs Allplan 2019 to an existing folder, converting Allplan 2016/2017/2018 to Allplan 2019 and transferring all important settings. Afterwards, you can no longer work with Allplan 2016/2017/2018.
This does nor affect earlier Allplan versions (Allplan 2015 or earlier).


Installing on a network:

  • If you work in a network environment (one common central file storage folder), you must upgrade all workstations to Allplan 2019. Beforeyou start installing, make sure that all workstations can be upgraded. For technical reasons, it is not possible to mix installations of different major releases. Any related problems area not covered by service contracts.
  • During the upgrade, Allplan 2016/2017/2018 must not be running on any workstation.
  • When installing with Workgroup Manager, make sure all workstations are checked in before you start upgrading.





Converting the data:

Data from earlier Allplan versions need to be converted to version 2019. Allplan 2019 automatically converts the data of a project you open. Click here for instructions on how to convert all projects in a single operation:

https://connect.allplan.com/en/faqid/20090408124904.html


IBD 2019

Click here for instructions on how to get your activation codes for Allplan IBD:

https://connect.allplan.com/en/faqid/20110912113530.html

Загрузка PDF  FAQ_EN_Hotletter_2019.pdf
Версия:  Allplan 2021  | Последнее изменение: 06.10.2020
Not voted yet. Be the first to vote this FAQ as helpful!

Information:

This document provides additional information on installing Allplan 2021.

Data backup/archiving:

We strongly recommend that you perform a complete data backup and archive this data before you upgrade to Allplan 2021!


Installation Instructions:


Detailed installation instructions can be found in the following places:

- If you have downloaded and unpacked Allplan 2021, you will find the file install.chm in the folder C:\Users\Public\Documents\Allplan 2021\HelpFiles\English


Please read these before installing Allplan 2021.

System requirements Allplan 2021

https://connect.allplan.com/de/faqid/20200930085615.html

Licenses when upgrading to Allplan 2021

https://connect.allplan.com/en/faqid/20200821110044.html


Extract from the installation instructions (see above)

If you want to switch from Allplan 2018/2019/2020 to Allplan 2021, you have three basic installation options.

1. New installation

Allplan 2021 is installed in a new folder. Any existing installations of Allplan (2020 or older) are not affected. No data and settings are transferred to the new installation.

The following options are available for transferring data later:

Uninstall Allplan 2021 and then upgrade Allplan 2018/2019/2020.
Integrating the data by hand (administrator knowledge required).

2. New installation with data copy from version

Allplan 2021 is installed in a new folder. Any existing installations of Allplan (2020 or older) are not affected. The office standard (\std), projects (\prj) and user data (\usr) can be automatically copied from an existing version 2018/2019/2020 to the new installation folder.
In this way, you can create a duplicate dataset if necessary: all projects, standards and resources can be used in both Allplan 2021 and 2018/2019/2020. This allows you to test the transition to the new version in real life, while the existing Allplan installation remains fully functional.
Note, however, that this method of working should avoid parallel processing of data in both installations, as the subsequent merging is time-consuming.

2a. Continuation of new installation with data copy from version

This option is available if a new installation with data copy has already been performed on another computer accessing the same data server and therefore the data has already been transferred.

3. Upgrade with data transfer from version 2018/2019/2020

Allplan 2021 is installed in an existing folder. The existing installation of Allplan 2018/2019/2020 is converted to Allplan 2021 and all important settings are transferred (see also Limitations for Data Transfer). Allplan 2018/2019/2020 is then no longer available.
Any existing installations older than Allplan 2018 are not affected.


Network Installations:

For network installations (shared 'central file storage folder'), only one main release version can be used - all workstations must be brought to Allplan 2021. Before starting the installation, make sure that all workstations have upgrade authorization. A mixed installation of different main versions is not technically approved. Complications that may arise are not covered by the maintenance contracts.

During the upgrade, no workstation may be running any version 2020, 2019 or 2018.

In case of an installation with Workgroupmanager all workstations must be checked in during the upgrade.




Data Conversion:

Data from older Allplan versions must be converted to version 2021. This happens automatically for projects opened in Allplan 2021. For instructions on how to convert all projects at once, click here:

https://connect.allplan.com/de/faqid/20090408124904.html

Загрузка PDF  FAQ_EN_Hotletter_2021.pdf
Версия:  Allplan 2019 / Allplan 2018  | Последнее изменение: 05.05.2020
Not voted yet. Be the first to vote this FAQ as helpful!

Question:

How can I set up Allplan Share? What are the requirements?


Answer:

1)System requirementsfor Allplan Share

Software required

Allplan Version 2018 or higher

Network infrastructure required

Minimum requirements:

A 20-Mbit/s Internet connection for downloading and uploading data

Recommended setup:

At least a 50-Mbit/s Internet connection for downloading and uploading data

2) Licensing

You have two options to buy the Allplan Share option.

1. You can visit the Allplan Shop at ‘shop.allplan.com’.

Allplan Options -> Allplan Share

a. Specify how many licenses you want to buy and add the Allplan Share option to the cart.

b. Follow the instructions displayed and buy the Allplan Share option.

After you have bought the Allplan Share option, the licenses will be assigned to your Bimplus team. You can manage these licenses using ‘My Account’ - ‘Subscriptions and Users’.

2. You can contact the Allplan sales partner in your area.

3) Assigning licenses

Regardless of how you buy the Allplan Share option, you can manage the Allplan Share licenses in the Allplan Shop. Go to the ‘Subscriptions and Users’ area. As an alternative, you can also manage the licenses on the Bimplus portal. Here, go to the ‘Team members’ area.

Allplan Shop - ‘Subscriptions and Users’

1. Log in to the Allplan Shop and open ‘My Account’.

2. Click ‘Subscriptions and Users’ to see your licenses.

3. Select the Allplan Share option on the tab.

4. You can assign one or more Allplan Share licenses to team members. To do this, select the user in the list and assign the license by selecting the check box. You can remove the license at any time by clearing the check box.

If the list does not include the user to whom you want to assign a license, click ‘Invite new Bimplus team member’, enter the email address of the new team member and select a role.

As soon as the new team member has accepted the invitation, you can find this person in the list.

4) Using Allplan Share

To use the Allplan Share option, you require Allplan 2018. The Workgroup Manager option is not necessary.

Starting a project

You have three options to start an Allplan Share project:

1. You can create a new project and save it on Bimplus by setting the location to BIMPLUS. To create a Bimplus project with Allplan Share content, you require ‘Bimplus team owner’ or ‘Bimplus team admin’ privileges.

2. You can copy an existing Allplan project to Bimplus by selecting ‘Copy to’. You can then share this project with other project partners. This does not affect the source project.

3. You can move an existing Allplan project to Bimplus by selecting ‘Move to’. This moves the source project to Bimplus. As a result, this project is no longer available on the local computer or local network.

5) Managing users and assigning users to the project

Allplan Share is a cloud-based solution. Therefore, Allplan Share uses the Bimplus user management for project collaboration. As a result, Allplan Share is independent of local user management systems like Workgroup Manager.

After you have copied or moved an existing Allplan project to Bimplus, you must reassign the users to this project. Otherwise, they cannot access this project.

To define the project members, use the Bimplus project administration. In addition, you must invite new project members to the Bimplus project.

If these Bimplus project members are to use the Allplan Share option too, you must assign an Allplan Share license to each member in advance (as described in ‘3) Assigning licenses’).


Загрузка PDF  FAQ_EN_Allplan_Share.pdf
Версия:  Allplan 2021 / Allplan 2020 / Allplan 2019 / Allplan 2018 / Allplan 2017 / Allplan 2016  | Последнее изменение: 30.09.2020
Not voted yet. Be the first to vote this FAQ as helpful!

Question:

How can I make several projects available to users when Workgroup Manager is installed?



Answer:

You can make several projects available to a user or define a user as the project owner of several projects.

Do the following:

First, log in as the Allplan administrator.
If necessary, set up an Allplan user for the new Windows user: Services application -> Workgroup Manager -> Configuration -> Add a user
(Allplan 2014 and later:Services application -> Workgroup Manager ->Administer users)

Start Allplan and then ProjectPilot by clicking
File -> ProjectPilot

Open the Projects folder in the area on the left.
You can see all the projects in the Contents of "Projects" area on the right.

a. Making several projects available to users:
In the area on the right, select the projects to which you want to add users or from which you want to remove users (CTRL or SHIFT key or use a selection rectangle).

Click one of the selected projects with the mouse button. On the shortcut menu, click
Add / remove authorized users...
The Add / Remove Authorized Usersdialog box opens.

Select the users you want to add to or remove from the selected projects.
Note:
The user list displayed only helps you select users. It does not list all the authorized users currently assigned to projects.

Click Addor Remove.
This adds or removes the selected users to or from the selected projects. Whether users you have already added to a project are added again is irrelevant. The same applies if you remove users you have never added to a project.

b. Defining a project owner for several projects
In the area on the right, select the projects for which you want to define the owner (CTRL or SHIFT key).

Click one of the selected projects with the mouse button. On the shortcut menu, click
Change project owner...
The Define Owner dialog box opens.

Select the user you want to define as the owner of the selected projects.
Note: The user list displayed helps you select users. You can define only one user as the owner.

Click OK.

c. Defining a project owner for a project or making a project available to several users(also applies to earlier versions):
In ProjectPilot in the area on the right, click the relevant project with the right mouse button. On the shortcut menu, click Properties.
The Properties for <project name>dialog box opens. Switch to the Security tab and define the owner and the authorized users.



Note:

You can add or remove project users or define the project owner only if the projects in question are in the current Allplan format.

Загрузка PDF  FAQ_EN_Making_several_projects_available_to_users.pd...
Версия:  Allplan 2021 / Allplan 2020 / Allplan 2019 / Allplan 2018 / Allplan 2017  | Последнее изменение: 16.10.2020
1 user(s) found this FAQ helpful

Question:

How can I install additional Allplan workstations on an existing network (with or without Workgroup Manager)?



Answer:

Before you install the additional workstations, find out the path to the central file storage folder on a computer where Allplan has already been installed. Open the Services application on this computer. The Services application window shows the path to the central file storage folder.

Enter this path when Setup prompts you to specify the central file storage folder.
Select "Minimum" for the Setup type.



Notes:

  • Make sure the version you are installing is the same as the one installed on the other workstations.
  • In addition, make sure all workstations are running either with Workgroup Manager or without Workgroup Manager. To find out whether Workgroup Manager is installed or not, open the Services application and check the menus: if you can see the Workgroup Manager menu, Workgroup Manager is installed.
  • Installing additional workstations does not affect the data (projects, ...) in the central file storage folder.
  • If you add new users to a new Allplan workstation, do not forget to add them to the Workgroup Manager, too.
  • Version 2014 and earlier: if one of the computers also serves as the Allplan server, you cannot use the approach described above to find out the path to the central file storage folder.
    In this case, you will see the path to a local folder instead of the central file storage folder.
    Use a different computer to find out the path to the central file storage folder.
Загрузка PDF  FAQ_EN_Installing_Allplan_on_a_network_later.pdf ...
Версия:  Allplan 2017  | Последнее изменение: 09.10.2017
2 user(s) found this FAQ helpful

Information:

This document provides further information on installing Allplan 2017.

Backing up and archiving data:

We strongly recommend that you back up and archive all your data before you upgrade to Allplan 2017.


How to install:


You can find detailed instructions on how to install Allplan 2017 in the following places:

- After you have downloaded Allplan 2017, you can find the install.chm file in the Helpfiles\English folder.
- You can find the install.chm file on the Allplan 2017 DVD in the following folder: <DVD>:\programs\x64\Allplan\Helpfiles\English.

Please read these instructions before you install Allplan 2017.

Some notes on installing Allplan 2017

If you want to switch from Allplan 2014/2015/2016 to Allplan 2017, you can choose between three installation options. We recommend using the second option: first-time installation and copy data from Allplan 2014/2015/2016.

1. First-time installation

This option installs Allplan 2017 to a new folder without affecting any other Allplan installation (2016 or earlier). Setup does transfer neither data nor settings to the new installation.

If you want to transfer data later, you have the following options:

You can uninstall Allplan 2017 and then upgrade from Allplan 2014/2015/2016.
You can integrate the data manually (requires administrative knowledge).

2. First-time installation and copy data from Allplan 2014/2015/2016

This option installs Allplan 2017 to a new folder without affecting any other Allplan installation (2016 or earlier). You can configure the program to automatically copy the office standard (\std), projects (\prj) and user data (\usr) from Allplan 2014/2015/2016 to the new installations folder.
This duplicates the data: you can use all projects, defaults and resources both in Allplan 2016 and in Allplan 2014/2015/2016. This way, you can test the new version without losing your &apos;old&apos; Allplan version.
Bear in mind, though, that you should not mix data from different versions, as merging data later involves considerable time and effort.

2a. Continue with first-time installation and copy data from version

This option is available when you have already installed <Product_Version> and copied the data to a different computer that accesses the same data server. As a result, the data have already been transferred.

3. Upgrade and transfer data from Allplan 2014/2015/2016

This option installs Allplan 2017 to an existing folder, converting Allplan 2014/2015/2016 to Allplan 2017 and transferring all important settings. Afterwards, you can no longer work with Allplan 2014/2015/2016.
This does nor affect earlier Allplan versions (Allplan 2013 or earlier).



Installing on a network:

  • If you work in a network environment (one common central file storage folder), you must upgrade all workstations to Allplan 2017. Therefore, make sure you can upgrade all workstations (deadline for Serviceplus agreement: July 1, 2016) beforeyou start installing.
  • During the upgrade, Allplan 2014/2015/2016 must not be running on any workstation.
  • When installing with Workgroup Manager, make sure all workstations are checked in before you start upgrading.



Converting data:

IBD 2017

IBD 2017 is expected to be released with the Allplan 2017-0-1 Hotfix at the end of July 2016.
https://connect.allplan.com/en/faqid/20160707142752.html


Загрузка PDF  FAQ_EN_Hotletter_2017.pdf
Версия:  Allplan 2019  | Последнее изменение: 04.03.2019
1 user(s) found this FAQ helpful

Question:


How can I activate my licenses for Allplan Online products and assign these licenses to other people?


Answer:



1. Components required

Internet connection and internet browser

2. Purchasing licenses

You can purchase Allplan Online products in two ways.

2.1 Allplan Shop (shop.allplan.com)

Allplan Options, Bimplus Options
a. Specify how many licenses you want to buy and add the Allplan Online product to the cart.
b. Follow the instructions displayed and buy the Allplan Online product.
After you have bought the Allplan Online product, the licenses will be assigned to your Bimplus team. You can manage these licenses using “My Account” - “Subscriptions and Users”.

2.2 Contact the Allplan sales partner in your area.

3. Assigning licenses

You can manage your licenses for the Allplan Online product in the Allplan Shop. Go to the “Subscriptions and User” area. As an alternative, you can also use the Bimplus portal. Here, go to the “Team members” area.

3.1 Sign in to the Allplan Shop or the Bimplus portal.

• Allplan Shop: Select “My Account” - “Subscriptions and Users”.
• Bimplus portal: Select “Team members”.

3.2 Select the Allplan Online product.

3.3 You can now assign one or more Allplan Online product licenses to team members. Select the user in the list and assign the license by selecting the check box. You can remove the license at any time by clearing the check box.
If the list does not include the user to whom you want to assign an Allplan Online product license, click “Invite new Bimplus team member”, enter the email address of the new team member and select a role.

Important: Do not assign the role of team administrator to a new team member unless this is absolutely necessary. A team administrator has more rights than a project administrator. You can define project administrators in the Bimplus project and user management.

You can find the new team member in the list as soon as this new team member has accepted the invitation.

4. Managing users and assigning users to the project

Allplan Online products are cloud-based solutions. Therefore, the Bimplus user management is used for project collaboration.
To define the project members, use the Bimplus project administration. You must invite new project members to the Bimplus project.
If these Bimplus project members also want to use Allplan Online products, you must assign an Allplan Online product license to each project member (see “Assigning licenses”).

Загрузка PDF  FAQ_EN_Licensing_Allplan_Online_products.pdf
Версия:  Allplan  | Последнее изменение: 08.05.2019
Not voted yet. Be the first to vote this FAQ as helpful!

Question:

I want to switch to Windows 10 (64-bit). What do I need to know?


Answer:

Depending on the initial situation, keep in mind the following points.

Windows 8.1 to Windows 10:

You work with Allplan 2016 or later.
Wibu:
Changing the operating system should not affect the protection system. However, we nevertheless recommend that you return the license of the computer before you switch to Windows 10. Reactivate the license afterwards.
You can find a description of the steps at:
https://connect.allplan.com/en/faqid/20150821083335.html

You work with Allplan 2015 or an older version.
Softlock:
Allplan is protected by Softlock. Fix Softlock License Manager as described in the following document:
https://connect.allplan.com/en/faqid/20131024085525.html

Hardlock:
If Allplan does not accept the hardlock after the switch, reinstall the hardlock driver. You can find a description of the steps at:
https://connect.allplan.com/en/faqid/20131028125253.html



Windows 7 to Windows 10:

You work with Allplan 2016 or later.
Wibu:
You must return the license of the computer before you switch to Windows 10. Reactivate the license afterwards. You can find a description of the steps at:
https://connect.allplan.com/en/faqid/20150821083335.html

You work with Allplan 2015 or an older version.
Softlock:
As this switch changes all system components, you must keep in mind the following points. Return the license to us before you switch to the new operating system. You can find a description of the steps at:
https://connect.allplan.com/en/faqid/20150821084653.html
After the switch fix Softlock License Manager as described in the following document: https://connect.allplan.com/en/faqid/0001cc7e.html

Hardlock:
If Allplan does not accept the hardlock after the switch, reinstall the hardlock driver. You can find a description of the steps at:
https://connect.allplan.com/en/faqid/20131028125253.html



Note:
Allplan 2015-1-10 and later versions are running on Windows 10.
Allplan 2016-0-2 and later versions are running on Windows 10.
We cannot say whether earlier Allplan versions are compatible with Windows 10.

Загрузка PDF  FAQ_EN_Switching_the_operating_system_to_Windows_10_...
Версия:  Allplan 2013 / Allplan 2012 / Allplan 2011 / Allplan 2009  | Последнее изменение: 30.11.2017
Not voted yet. Be the first to vote this FAQ as helpful!

Question:

How can I output a test plot with different data types used in Allplan?



Solution:

Allplan comes with drawing files containing test data that can be used for this purpose.

If necessary, create a new project and copy the drawing files with the test data to this new project.

Open ProjectPilot: Allplan -> File -> ProjectPilot - Admin.

Set the external path to the &apos;..\New\Testplot&apos; folder, which is a subfolder of the local Allplan program folder.
Click &apos;External path&apos; with the right mouse button and, on the shortcut menu, choose &apos;Select external path&apos;.
Select the &apos;..\New\Testplot&apos; folder, which is a subfolder of the local Allplan program folder: c:\Programs\Nemetschek\Allplan\New\Testplot, for example.

The following layouts and drawing files are available:

  • Layout 1 - Test Plot Allplan Testbild / Allplan Test Layout
  • Layout 2 - Test Plot Muster & Schaffur / Patterns & Hatching
  • Layout 3 - Test Plot Allplan Testbild / Allplan Test Layout
  • Drawing file 25 - Füllflächen + Stifte / Fills + Pens
  • Drawing file 26 - Muster / Patterns (Version 2006 and later)
  • Drawing file 27 - Schraffuren / Hatching (Version 2006 and later)
  • Drawing file 100 - Allplan Test Drawing File (Version 2008 and later)


Copy these layouts and drawing files to the new project.
Select the relevant drawing files with the right mouse button and choose &apos;Copy to ...&apos; on the shortcut menu.
Select the new project.

If necessary, create a layout, place the drawing files in this layout, specify an output device and and print the layout.

Note:

Make the following settings to ensure that the data is output correctly:

  • Select "white" for the background color.
  • Turn off "Color stands for pen" in "Show/Hide".
  • Turn off "Surface elements in background of each document" on the "Selection" tab of "Plot Layouts".
  • Use Windows drivers for printing.
  • For HP plotters, select the "Avoid out of memory condition" or "Output as a bitmap" option in the plotter properties.
  • For optimum color output with sRGB values, apply the settings described in the FAQ entitled Color adjustment - Windows drivers and Nemetschek vector drivers.
    https://connect.allplan.com/en/faqid/0001a106.html



Notes:

Colors in printouts can vary depending on several factors such as

  • Output device used
  • Paper used
  • Ink used
  • Driver type used (Windows or Nemetschek drivers)

In particular, colors can differ regarding

  • Color display
  • Brightness


Colors in printouts can even vary if you use the same output device but different Windows drivers.
On-screen display can be influenced by various factors such as different settings for contrast and color temperature.

As the possible settings are so widespread, you can see that it is essential to print out test data in advance.

Загрузка PDF  FAQ_EN_Printing_test_plots.pdf
1 - 10 (10)
  • 1
https://campus.allplan.com/ uses cookies  -  More information

Accept