Question:

How can I transfer the license permanently to a new computer?
How can I temporarily transfer the license of a registered computer to a different computer?
How can I interchange the licenses of two registered computers?



Answer:

If you activated the license online by entering a Product Key, you can return the Product Key and then use it for a different computer. You can return and activate the license only if the computers have Internet access. The computer where you want to return or activate the license does not have to be online all the time. It is enough if it is online while you are returning or activating the license.


Returning a license
To return a license in online mode

  • Open the 'License settings' dialog box: Services application -> Utilities -> License settings
  • Write down the Product Key for the license you are returning.
  • Click License activationon the left. Then click the license you want to return.
  • Click Return license.


You can now activate the license on a different computer.


Activating a license
If you want to transfer the license permanently, you can activate a license while you are installing Allplan or after you have installed Allplan. By activating a license, you connect the license with the new or other computer. As a result, you can start Allplan on this computer.
If you want to transfer the license only temporarily, install Allplan as a viewer on the second computer and
activate the license later.

To activate the license during installation:
Start Setup and follow the instructions displayed.

  • In the 'Installation Option' dialog box, select the 'Enter Product Key' option and click 'Next'.
  • Enter your Product Key.
  • Click 'Activate license'.


To activate the license after installation:

  • Open the 'License settings' dialog box: Services application -> Utilities -> License settings
  • Click License activationon the left.
  • Enter your Product Key.
  • Click Activate license.



Here comes a practical example:
If you want to use a Product Key for running Allplan on two or more computers, you must use computer A to return the license before you can use this license with computer B. To return the license, open the Services application -> Utilities -> License settings -> Return license. If this computer always uses the same Product Key, you can find this Product Key in the box below License activation. This box always displays the last Product Key entered.

If you switch between several licenses, it is a good idea to save the Product Keys used in a text file on the desktop. This way, you can copy the Product Keys quickly and easily to the license settings.


Note: When license cannot be returned due to defect
If your computer has a defect and does not start anymore, or your hard disk has crashed and you had to install a new one, we need a statutory declaration from you. You will receive this declaration after your situation has been checked by the technical support team. Please contact your local Allplan Support with a brief description of what happened.


Further Notes:
You can also find your Product Key in Allplan Connect. Go to http://connect.allplan.com/license
Click Profile -> License administration.
Only administrators can use this function.

Загрузка PDF  FAQ_EN_Transferring_license_to_a_new_or_another_comp...
Версия:  Allplan 2020 / Allplan 2019 / Allplan 2018 / Allplan 2017 / Allplan 2016 / Allplan 2015 / Allplan 2014 / Allplan 2013 / Allplan 2012 / Allplan 2011  | Последнее изменение: 01.11.2019
19 user(s) found this FAQ helpful

Question:

I just installed an upgrade. How can I convert all the projects at once?



Answer:

Back up all the projects beforehand!

Do the following:

  • Exit Allplan on all workstations.
  • Only when working with Workgroup Manager:
    Log in as the Allplan administrator (sysadm).
  • Start the Services application.
  • Only when working with Workgroup Manager:
    Make sure all the computers where projects are located are up and running.
    To check this, select:
    Services application -> Workgroup Manager -> Information -> Display Project List(the second column displays the computer where the project is located).
  • Go to the computer where you want to convert the data and set the drawing file size to the maximum value:
    Services application->Service ->Hotline Tools->docsize ->512 (or 1024, if available) ->OK
    Note:
    After data conversion, you can set the drawing file size back to the initial value.
  • Start converting the data (use the computer where you have changed the drawing file size):
    Services application ->Service ->Hotline Tools -> datwaprjs: convert data of all projects
    If you reply "Yes" at the following two prompts, the program will convert the data of all projects.



Notes:

The time it takes to convert the data depends on various factors:

  • Number of projects
  • Size of each project
  • Performance of the computer converting the data
  • Network performance


It is possible to start data conversion from several workstations at the same time.

Загрузка PDF  FAQ_EN_Converting_all_Allplan_projects_in_a_single_o...
Версия:  Allplan 2020 / Allplan 2019 / Allplan 2018 / Allplan 2017 / Allplan 2016  | Последнее изменение: 25.11.2019
2 user(s) found this FAQ helpful

Question:

How can I import data from an earlier version?



Answer:

You can import data from the last three Allplan versions.
Consequently, the following import operations are possible:

Target version <- import possible from version

2017 <- 2014
2016 <- 2013
2015 <- 2012
2014 <- 2011
2013 <- 2009
2012 <- 2008
2011 <- 2006
2009 <- 2005
2008 <- 2004
2006 <- 2003
2005 <- 17
2004 <- 16

We cannot guarantee that data created in older versions can be imported and edited. The conversion of older data may be incomplete, which may affect intelligent components in particular.


1. Archived data from an earlier version (not older than three previous versions):

There are two ways to convert the data to the current version:

  • Import the project backups created and archived using the
    Services application -> Data Backup -> Import -> Projects.
    After importing the projects, convert them by opening each project once.
  • Import the backups archived using the
    Services application -> File -> Restore documents of any version to '...\Extern'.
    The data are written to the external path.
    You can now process the converted data in ProjectPilot.



2. Archived data from an older Allplan version (older than three previous versions):

  • See whether you can use the approach described in step 1 to import the old projects.
  • If available, it is a good idea to install an old Allplan version. Import the backups created and archived into this old version and convert the projects using the Services application. If you have imported a complete project backup, convert the data by opening each project once. When finished, repeat this process with a newer version (up to three versions later) until the data are up-to-date.
  • If an old Allplan version is not available, you can also have the data converted by Allplan. Please note that this service is not free of charge. Please contact Technical Support -> support.de@allplan.com.




Notes:

  • You can convert the data of all projects at once. Read the following FAQ in Allplan Connect: https://connect.allplan.com/en/faqid/20090408124904.html
  • If enough hard disk space is available, you are advised to keep and maintain the projects so that Allplan automatically converts them to the current version whenever you upgrade.
  • If there are project-specific smart symbol catalogs, you should open the smart symbol catalog once to convert the data.
Загрузка PDF  FAQ_EN_Transferring_data_from_old_Allplan_versions_....
Версия:  Allplan 2020 / Allplan 2019 / Allplan 2018 / Allplan 2017 / Allplan 2016 / Allplan 2015 / Allplan 2014  | Последнее изменение: 30.03.2020
3 user(s) found this FAQ helpful

Question:

How can I check out a computer and continue to work as a normal CAD user with my usual settings and permissions?



Answer:

Install the "Microsoft Loopback Adapter" driver.
This driver is necessary so that network services are running on the computer all the time.
Go to Allplan Connect for a detailed description: https://connect.allplan.com/en/faqid/000162ae.html


Sign in as the Allplan administrator to the computer.


Step 1: add the computer to workgroup manager
You must add the computer to the workgroup so that you can store data (data server) on this computer. Do the following:

Create data folders:
Create a folder - for example, “Nemdata” - on the computer and share it (full control).
Create the “Allplan” subfolder in this folder. Create two subfolders - “usr” and “prj” - in the Allplan folder.
In this example: “...\Nemdata\Allplan\prj” and “...\Nemdata\Allplan\usr”

To share a folder for the Allplan file storage

  1. Start File Explorer on the computer that you want to use for file storage and switch to the folder that you want to share (in this example, the “Nemdata” folder).
  2. Right-click the folder that you want to share and select Give access to -> Specific peopleon the shortcut menu.
  3. Select Everyoneand click Share.


Add computer:

  1. Start the Services application as the workgroup administrator.
  2. Click and select Manage computers and projects.
  3. Click the Add any computer to Allplan workgroupicon and select the computer that you want to add.
  4. Select the “Allplan” subfolder under the share and click “OK” to confirm. This computer is now listed under workgroup server.


Note:If you have problems adding the computer to workgroup manager, read the following instructions:
https://connect.allplan.com/en/faqid/20200317162849.html



Step 2: define project owner
A user can only move a project if the user is the owner of this project.
The ownership of a project can only be changed by an Allplan administrator (or the owner of the project).
Allplan -> File -> ProjectPilot ->
Go to the “Projects” node, right-click the required project and click Propertieson the shortcut menu.
Define the owner.


Step 3: move projects
Sign in as the user who wants to check out the computer.
Select the Services application -> Workgroup Manager -> Manage computers and projects.
Click the main server and select the project that you want to move.
Drag the projects one after the other to the computer to be checked out.

Important note: You can take projects with you in several ways.

1. You move the project to the computer.
Move project: Drag the project to the destination computer, or open the shortcut menu of the project and click “Cut”. After this, open the shortcut menu of the destination computer and click “Paste”.
After you have checked in the computer, move the project back to the server so that it is available to all and included in backups again.

2. You copy projects. Click a project, select and hold the Ctrl key and drag the project to the destination computer. Or: Open the shortcut menu of the project and click “Copy”. After this, open the shortcut menu of the destination computer and click “Paste”.

You can continue in two ways: Lock the original project on the server to protect it from changes. Consequently, nobody in the office can work on this project, but it is still on the server. When you check in the computer again, you unlock the project on the server, delete the project and copy your copy back to the server if you have changed the project.
Alternatively, both projects remain active. Consequently, both the project copied and the original on the server can be worked on. In this case, however, you must adjust the data manually when you are back in the office by copying the changed drawing files of the projects by using ProjectPilot.




Step 4: check out the computer
Select the Services application -> Workgroup Manager -> Manage computers and projects.
Click your computer and then click Check outin the lower-right area.
Confirm the message that tells you that there are still user folders on the computer to be checked out.
Enter a comment and click OK. Users in the office see this comment when they try to access a project that is on the computer that is checked out.
Specify the parts of the office standard you want to copy to the computer and click OK to confirm.
The first time you check out the computer, you must copy the office standard once so that the entire STD folder is on this computer. This is no longer necessary when you check out the computer afterward because the contents of the STD folder do not change very often.


Conclusion:

You can now remove the computer from the network and work on your projects when you are out of the office. To make sure that the projects are not changed in the office in the meantime, the projects that are on the computer checked out are locked for the CAD users on the network. These users see the comment you entered when you checked out the computer.



Notes:


Загрузка PDF  FAQ_EN_Workgroup_Manager_checking_out_computer_and_w...
Версия:  Allplan 2020 / Allplan 2019 / Allplan 2018 / Allplan 2017 / Allplan 2016 / Allplan 2015 / Allplan 2014 / Allplan 2013  | Последнее изменение: 31.08.2020
Not voted yet. Be the first to vote this FAQ as helpful!

Question:

How can I fix Allplan program data?


Answer:

You can fix Allplan program data by renaming the program folders and installing an update.
Due to the new names, Allplan cannot find the resources during the update. Consequently, it creates new resources.

To fix Allplan program data, do the following:

You need the latest installation package for your version.
You can download this package from Allplan Connect (www.connect.allplan.com) or from our FTP server.

Accessing the FTP server:
Enter the following address in Windows Explorer (do not use Internet Explorer!):
ftp://nemhotline:ha37jvg8f@ftp.nemetschek.de

You can find the installation packages in the following path:
/download/Allplan/"version"/CD/
Copy the zip file to the local computer and unzip the file.

  • Open the Services application of the Allplan version you want to fix.
  • Select Service -> Windows Explorer -> CAD program folder.
  • Rename the "PRG" folder "PRG_OLD". If Windows Explorer tells you that a file is still in use, restart the computer and try again.
  • Start the *.exe file of the installation package you just unzipped.
  • Select "Update installation".
  • When Setup prompts you for the license, select "Current license file" or "Use active license".
  • Select "Minimum" for the Setup type.



Allplan gets new program resources during installation.
As soon as the installation is complete, you can test how Allplan behaves.


Note:

If you are not sure, give these instructions to your system administrator.
Keep in mind that you install the version of the installation package you downloaded. This means that you may have to reinstall any subsequent hotfixes.

Загрузка PDF  FAQ_EN_Fixing_Allplan.pdf
Версия:  Allplan 2020 / Allplan 2019 / Allplan 2018  | Последнее изменение: 31.03.2020
Not voted yet. Be the first to vote this FAQ as helpful!

Task:

You want to transfer a project with all its settings to a partner office for further editing.

Note:

The following description works only if both partners use the same version of Allplan (Allplan 2018-1 or later).

1. Backing up the project:

Before you back up the project, make sure that “office” or “project” is selected for the path settings of the project.
To do this, open ProjectPilot and select the project: right mouse button -> Properties-> Settings. Here, you can select the path settings.
For exchanging projects with partner offices, we recommend that you switch all project settings to “project”.
This ensures that all pen definitions and line definitions, user-defined fonts, patterns and hatching styles, bar and mesh cross-section catalogs, and layer definitions will be copied to the project and backed up together with the project.

Note:
After the backup, switch the path settings back to “office”. But do not change the paths that already had the “project” setting.

Start Allplan and select the “File” menu -> “New Project, Open Project...”.
Right-click the project that you want to back up and select "Create project backup".
(Allplan 2018: Select “Compress and export project”: )
Select the folder where you want to save the project.

2. Importing the project:

To add a compressed project to the "New Project, Open Project" dialog box

Start Allplan and select the “File” menu -> “New Project, Open Project...”.

  • Drag a compressed project (*.zip) from the desktop or from File Explorer into the "New Project, Open Project" dialog box.
  • Specify the folder and enter a name for the project; then, click OK.
  • Allplan unzips the project, adding it to the project list.


Загрузка PDF  FAQ_EN_Transferring_projects_with_all_settings_to_pa...
Версия:  Allplan 2020 / Allplan 2019 / Allplan 2018 / Allplan 2017 / Allplan 2016  | Последнее изменение: 25.11.2019
Not voted yet. Be the first to vote this FAQ as helpful!

Question:

Does Allplan create backup files (*.bak)?
How can I use these files?



Answer:

Allplan creates backup files when you do the following:

  1. Copy, Move Elements between Documents …
    Allplan creates a backup file of the destination drawing file or layout.
  2. Deleting drawing files and layoutsin the "Open on a project-specific basis" dialog box
    If you have selected "Create backup copies of drawing files", Allplan creates a backup file of the drawing file or layout.
  3. Importing data to drawing files
    If you have selected "Create backup copies of drawing files", Allplan creates a backup file of the drawing file.


Note on points 2 and 3:

To select the "Create backup copies of drawing files" option, click
Tools -> Options -> Desktop environment -> Save/load area (until V2009 Global Options -> Miscellaneous -> Autosave, Backup)->Create backup copies of drawing files.


Restoring:

If need be, you can restore the original drawing file or layout.
Make a note of the drawing file number or layout number and determine the corresponding project folder as follows:
Services application -> Service -> Hotline Tools -> wopro

Open this folder in Windows Explorer.

Rename the corresponding drawing file "tb000001.ndw" "tb000001.ndw.old" or the corresponding layout "pb000001.000" "pb000001.000.old.", for example.
Delete the bak extension from the corresponding bak file.

Example 1:

You have inadvertently copied the wrong elements to drawing file 4711.
1st step: exit the project in Allplan.
2nd step: delete file tb004711.ndw or rename it tb004711.ndw.old.
3rd step: find file tb004711.ndw.bak and rename it tb004711.ndw.

Example 2:

You have inadvertently copied the wrong elements to layout 815.
1st step: exit the project in Allplan.
2nd step: delete file pb000815.000 or rename it pb000815.000.old.
3rd step: find file pb000815.000.bak and rename it pb000815.000.



Note:

These backup files can considerably increase the volume of data to be backed up. So it is a good idea to delete the .bak files you no longer require before you start backing up data. To delete the .bak files, you can select the Services application and click Utilities -> Delete temporary files.

You can also find this information in the help for Allplan. Please refer to the topic "Using bak files".

Загрузка PDF  FAQ_EN_Using_bak_files.pdf
Версия:  Allplan 2020 / Allplan 2019 / Allplan 2018 / Allplan 2017 / Allplan 2016 / Allplan 2015 / Allplan 2014 / Allplan 2013  | Последнее изменение: 25.11.2019
3 user(s) found this FAQ helpful

Question:

How can I restore a lost building structure or layout structure?



Answer:

To restore a lost or corrupt building structure or layout structure, you can do the following:

  • Close Allplan.
  • Open Windows Explorer, go to the central file storage folder of Allplan and open the "Prj"folder. Open the corresponding project folder and the "BIM" subfolder.

    Note:
    If the "Same folder name as project name" option is not selected for the project, a number is used for the folder name in the "Prj"folder. In this case, open the Services applicationand select the woprohotline tool (Services application -> Service -> Hotline Tools -> wopro). Select the corresponding project by double-clicking its name. An information dialog box shows the folder and file name of the project.
  • You can find an XML file for each structure in the BIM subfolder.


Building structure:
Allplan_BIM_BuildingStructure.xml

Objects derived from building structure:
Allplan_BIM_Views.xml

Plane model:
Allplan_BIM_LevMo_"name of model".xml

Layout structure:
Allplan_BIM_LayoutStructure.xml

  • To restore the building structure from a backup, rename the existing file "Allplan_BIM_BuildingStructure.xml" "Allplan_BIM_BuildingStructure.xml.old", for example.
  • Switch to the "Backup"folder, which you can also find in the"BIM"folder.
  • Select the most recent file that had been created beforethe building structure was deleted, for example, "Allplan_BIM_BuildingStructure.xml.27.5.2008--10-32-21.bak". The characters in bold indicate the date and time of the backup. Copy this file to the "BIM"folder.
  • Rename this file by deleting the characters after ".xml". Now the file name is "Allplan_BIM_BuildingStructure.xml".
  • Restart Allplan. The last version of the building structure is displayed in the "Open on a project-specific basis"dialog box again.




Note:

Using Allplan 2009-2 and later, you can restore the layout structure from a *.bak file straight from the "Open on a project-specific basis: layouts"dialog box.

  • Right-click the topmost structural level in the layout structure (project name) and select Load layout structure favoriteon the shortcut menu.
  • Open the last version of the Allplan_BIM_LayoutStructure.xml file in the backup folder mentioned above.


If the *.bak files are not displayed, please follow the steps described above.

Загрузка PDF  FAQ_EN_Restoring_building_structure_layout_structure...
Версия:  Allplan 2015 / Allplan 2014 / Allplan 2013 / Allplan 2012 / Allplan 2011 / Allplan 2009 / Allplan 2008  | Последнее изменение: 02.09.2016
4 user(s) found this FAQ helpful

Question:

How can I transfer the NemSLock license permanently to a new computer?



Answer:

Proceed as follows:

  • Install the program on the new computer. Use the temporary license (xxx_xxx_psd.nslock) you received when you purchased the program. If you do not have a temporary license of the current version, contact your support team to request such a license.
    You can then work with the program for 30 days – plenty of time to configure your new computer, transfer the office standard and projects and so on (you can find instructions in the FAQ database).
    At the same time you can work with the program on your old computer without any restrictions.
  • When you have transferred everything you need, return the license to us. To do this, use the old computer and click
    Start -> (All) Programs -> Nemetschek -> Nemetschek SoftLock 2006 -> License Manager
    (Services application -> Utilities -> License -> License Manager (NemSLock)).

    Click "Relocate licenses -> Transfer licenses permanently to a computer". This creates the COMPUTER_NAME.hrdwchg file. Send this file by email to register@nemetschek.de.


Tip: Click &apos;Browse&apos; in the &apos;Send hardware change file (*.hrdwchg)&apos; dialog box. The program creates and saves the COMPUTERNAME.hrdwchgfile. Then Windows Explorerstarts and the folder with the hardware change file opens. You can now use all the options provided by Windows Explorer: for example, you can attach the file to an email, copy it to a computer having Internet access and so on. Email this file to register@nemetschek.de.

Note:
After you have created this file, the Allplan license of your old computer will still be valid for two more days.
As soon as we have removed the registration, we will send you a confirmation by email.

  • Create a registration request (register.txt) on the new computer and send this file by email to register@nemetschek.de.

    To generate a registration request, do the following:
    Open the License Manager (Service application -> Utilities- > License -> License Manager). Select the license entry for your seat and click "Request license". Please follow the instructions displayed on screen. Complete the form. Do not forget to enter your email address.

    You will promptly receive the license for the new computer (provided you have returned the license to us as described above).
    Installing this license file completes the license transfer to the new computer.



Note:

The COMPUTER_NAME.hrdwchg file is stored in the following folder:

Allplan 2012 and earlier:

  • Windows 64-bit:

C:\Program Files (x86)\Common Files\Nemetschek\NemSLock2006\License

  • Windows 32-bit:
    C:\Program Files\Common Files\Nemetschek\NemSLock2006\License


Allplan 2013 and later:

  • C:\ProgramData\Nemetschek\NemSLock\AllplanLicense
  • or C:\ProgramData\Nemetschek\NemSLock\HardwareTausch
Загрузка PDF  FAQ_EN_Transferring_NemSLock_license_permanently_to_...
Версия:  Allplan 2020 / Allplan 2019 / Allplan 2018 / Allplan 2017 / Allplan 2016 / Allplan 2015 / Allplan 2014 / Allplan 2013 / Allplan 2012  | Последнее изменение: 30.01.2020
1 user(s) found this FAQ helpful

Task:

You have installed Allplan on several local workstations. Now you want to change the installation so that you can access a common network drive.



Note:

Before you switch to a network installation, it is essential that you back up all the data of all the workstations.
We strongly recommend that you take advantage of the expertise of Nemetschek’s technical support staff. We are happy to help you!



Solution:

The following description shows how to change several workstations where Allplan is installed locally and the project data is also stored locally on each computer to workstations with a common network drive without Workgroup Manager.

1st - getting ready
Choose one of the workstations where you will install all the projects and the office standard (hereinafter referred to as the main workstation).
First, move all the projects to the main workstation.

1.a: copying resources into projects
To make sure that the projects in your office have a uniform appearance, change the path settings for the projects' resources to 'Project'.
Make the following setting for each project:
Allplan -> File menu -> ProjectPilot - Admin -> select the individual projects one after the other -> right mouse button -> Properties -> Settings tab
Set the path settings for 'Pen and line definitions', 'Fonts', 'Patterns, hatching styles, area styles', 'Bar and mesh cross-section catalogs', 'Layer structures, line styles, drawing types' and 'Attributes proposed' from 'Office' to 'Project', if necessary.
The corresponding elements are copied from the office standard directly to the project. This ensures that the project settings stay the same even when you copy the project to the new server with the new office standard.

1.b: same folder name as project name
Open the 'General' tab and select the 'Same folder name as project name' setting if you want to proceed as described in 2b.

1.c: pen color ("Color stands for pen")
The pen color for the "Color stands for pen" setting is a user-specific setting that is not saved in the project but in the user folder (...\Usr).

2.a: backing up projects of the individual workstations and importing them to the main workstation (recommended method):
Back up the individual projects. To do this, open the Services application and select Data Backup -> Create -> Entire folders -> Projects.
You can back up several projects in a single operation.
Before you start, specify the backup folder on the network or on the local hard disk: Services application -> Configuration -> Backup path ->Browse for Folder.

The next step is to import the saved projects to the main workstation.To do this, open theServices application -> Data Backup -> Import -> Projects Before you import the individual projects, you can create new Allplan projects at the main computer. As an alternative, you can also create a new project during the import.

2.b: backing up projects of the individual workstations and importing them to the main workstation (special approach):
This approach should only be used with good reason for exceptional cases as it requires in-depth knowledge of Windows.
With this method, Windows Explorer is used to import the projects to the main workstation.
If some project names exist twice, you need to rename these projects before you back them up.

You can then rename the existing 'project.dat' file in the Prj folder of the main workstation.
Next, select the Services application -> Service -> Hotline Tools -> reorg -> Restore project management file.
The system creates a new project administration file (project.dat), which should list all projects with names.

Now the main workstation contains the latest version of all the projects of the office.

3rd - merging project defaults
Open ProjectPilot at the individual workstations and copy the elements you want to transfer (symbols, smart symbols, lists, schedules, and so on) to the external path. Of course, you can set the external path to a common network folder that can be accessed by all workstations.
Next, open ProjectPilot at the main workstation and copy the contents of the external path to the office standard.

4th - data backup

  • Back up the projects, office standard and user settings at the main workstation:
    You can also copy the ..\prj (projects), ..\std (office standard) and ..\usr (user folder) paths to a backup folder (Nemsic, for example) on the hard disk.
  • In addition, you need to back up the ..\usr\local folder at every stand-alone computer.
  • Export the user interface setting of each user to a file: Allplan -> Tools - > Customize .... -> Export...


5th - uninstalling
Remove Allplan from all workstations.

6th - reinstalling
Before you install the same version again, create and share a folder (Nemdata, for example) on the future data server. Create a subfolder - Allplan - in this folder.

The next step is to reinstall the same version on all the workstations.

Specify the following installation paths:
Program folder:
local (C:\Programs\Nemetschek\Allplan, for example)
Central file storage folder:
Browse -> Network...
Find the sharedNemdata folder and select the Allplan folder.

After this, start installing.

7th - testing the start and restoring the backup
After the installation (check whether Allplan starts), copy the ..\prj and ..\std folders you backed up from the main workstation to the new ...\Nemdata\Allplan server folder.

Next, use Windows Explorer to copy the contents of the former user folder (…\usr\local) of the stand-alone workstation to the new user folder of the computer you just installed.

8th - updating the project administration file
Go to the project.datfile in the ...\Nemdata\Allplan\Prjfolder and rename itproject.alt.After this, do the following:
Services application -> Service -> Hotline Tools -> reorg -> Restore project management file.

9th - summary
Now all the workstations access a common network drive with the same project pool and office standard.
With this type of installation, only one user can access a project at any one time. If several users are to work on a project at the same time, you need to install Workgroup Manager.