Search Result

21 - 30 (58)
Version:  Allplan 2021 / Allplan 2020 / Allplan 2019 / Allplan 2018 / Allplan 2017 / Allplan 2016  | Last modified: 30.09.2020
Not voted yet. Be the first to vote this FAQ as helpful!

Question:

How can the program "Codemeter Control Center" be installed manually.


Answer:

Exit Allplan.

A current and released version of "Codemeter Control Center" can be downloaded from the following link.

https://webdrive.allplan.com/s/4LrjrymoxESzC6p

The program is located in the folder.
/Allgemein/Wibu/

(Click on the three dots to the right of the file size and select download)


Start the file "CodemeterRuntime.exe" bypassing the user account control. To install, activate the file with the right mouse button and select "Run as administrator".
Confirm all messages in the setup, as well as the default settings with 'Next'.
Codemeter Control Center will then be installed.


Note:
If you are using an Allplan license server, the Codemeter Control Center program is not only available on every Allplan client, but also on the server running the Allplan license server.
Install Codemeter Runtime on your license server in the same way.
Please also note the following instructions for the license server.
https://connect.allplan.com/en/faqid/20200925120630.html

Download PDF  FAQ_EN_Install_Codemeter_Control_Center_manually.pdf...
Version:  Allplan 2021 / Allplan 2020 / Allplan 2019 / Allplan 2018 / Allplan 2017 / Allplan 2016  | Last modified: 30.09.2020
Not voted yet. Be the first to vote this FAQ as helpful!

Question:

How can I make several projects available to users when Workgroup Manager is installed?



Answer:

You can make several projects available to a user or define a user as the project owner of several projects.

Do the following:

First, log in as the Allplan administrator.
If necessary, set up an Allplan user for the new Windows user: Services application -> Workgroup Manager -> Configuration -> Add a user
(Allplan 2014 and later:Services application -> Workgroup Manager ->Administer users)

Start Allplan and then ProjectPilot by clicking
File -> ProjectPilot

Open the Projects folder in the area on the left.
You can see all the projects in the Contents of "Projects" area on the right.

a. Making several projects available to users:
In the area on the right, select the projects to which you want to add users or from which you want to remove users (CTRL or SHIFT key or use a selection rectangle).

Click one of the selected projects with the mouse button. On the shortcut menu, click
Add / remove authorized users...
The Add / Remove Authorized Usersdialog box opens.

Select the users you want to add to or remove from the selected projects.
Note:
The user list displayed only helps you select users. It does not list all the authorized users currently assigned to projects.

Click Addor Remove.
This adds or removes the selected users to or from the selected projects. Whether users you have already added to a project are added again is irrelevant. The same applies if you remove users you have never added to a project.

b. Defining a project owner for several projects
In the area on the right, select the projects for which you want to define the owner (CTRL or SHIFT key).

Click one of the selected projects with the mouse button. On the shortcut menu, click
Change project owner...
The Define Owner dialog box opens.

Select the user you want to define as the owner of the selected projects.
Note: The user list displayed helps you select users. You can define only one user as the owner.

Click OK.

c. Defining a project owner for a project or making a project available to several users(also applies to earlier versions):
In ProjectPilot in the area on the right, click the relevant project with the right mouse button. On the shortcut menu, click Properties.
The Properties for <project name>dialog box opens. Switch to the Security tab and define the owner and the authorized users.



Note:

You can add or remove project users or define the project owner only if the projects in question are in the current Allplan format.

Download PDF  FAQ_EN_Making_several_projects_available_to_users.pd...
Version:  Allplan 2019 / Allplan 2018 / Allplan 2017 / Allplan 2016 / Allplan 2015 / Allplan 2014  | Last modified: 20.08.2019
Not voted yet. Be the first to vote this FAQ as helpful!

Questions:

Why can’t I see anything in a project or why are elements missing from drawing files?
Why are layers not visible?
Why is it not possible to select a privilege set in layer selection?



Answer:

Probably, you have not yet been assigned any privilege sets or the layers are frozen in the privilege set in question. First, check whether you can select another privilege set.


1. Selecting another privilege set

To do this, select the project in question and open the layer settings(Format -> Select, Set Layers). Go to the “Privilege set in list box” area at the top on the right and check whether you can select another privilege set (for example, ALLPLAN).
By default, all layers have full access rights in the predefined ALLPLAN privilege set.

If there is no privilege set with full access rights, you should assign the privilege sets correctly.
This can only be done by a user with administrator privilegesor, in the case of a project-specific layer structure, by the project owner.

Thus, log on as a user with administrator privileges and do the following:


2. Assigning a privilege set

Select the project with the frozen layers.

Open the layer settings(Format -> Select, Set Layers). Switch to the "Privilege Set" tab and click Define, modify privilege set.

Select the relevant user and assign the privilege set using the arrows.

Click OKto confirm.


3. Adjusting layers’ access rights in the privilege set

Finally, check the access rights of the layers in the privilege set assigned.
Go to the "Privilege set in list box" area at the top on the right and select the relevant privilege set (for example, ALLPLAN).

Check the area on the left to see whether there are frozen layers (gray or white). To change this, select these layers or simply select all layers using CTRL+A. Then click the Full access right (modifiable)icon in the “Change rights” area.
Click OKto confirm.

The next time you open this project, you can select this privilege set in the layer settings. You can then see all layers and set them to modifiable.

Do the same with print sets.


Alternative:

Since version 2006, the administrator has been able to select Show all users all print sets and privilege setsin the “Administrator options” group on the “Privilege Set” tab (“Design group” in version 2006). Thus, you do not need to assign new users to privilege sets. This option applies to all projects.

However, as soon as a user has been given a privilege set or print set, this option no longer applies to this user.



Note:

As a project can have its own layer structure, it is essential that you check the privilege set in the correct project.
To find out whether a project has its own layer structure, click
File -> New Project, Open Project-> right-click the relevant project -> Properties. Check whether the path settings for Layerstructuresare set to Officeor Project.

Download PDF  FAQ_EN_Enabling_privilege_set_for_user.pdf
Version:  Allplan 2020 / Allplan 2019 / Allplan 2018 / Allplan 2017 / Allplan 2016 / Allplan 2015 / Allplan 2014 / Allplan 2013 / Allplan 2012  | Last modified: 30.01.2020
1 user(s) found this FAQ helpful

Task:

You have installed Allplan on several local workstations. Now you want to change the installation so that you can access a common network drive.



Note:

Before you switch to a network installation, it is essential that you back up all the data of all the workstations.
We strongly recommend that you take advantage of the expertise of Nemetschek’s technical support staff. We are happy to help you!



Solution:

The following description shows how to change several workstations where Allplan is installed locally and the project data is also stored locally on each computer to workstations with a common network drive without Workgroup Manager.

1st - getting ready
Choose one of the workstations where you will install all the projects and the office standard (hereinafter referred to as the main workstation).
First, move all the projects to the main workstation.

1.a: copying resources into projects
To make sure that the projects in your office have a uniform appearance, change the path settings for the projects&apos; resources to &apos;Project&apos;.
Make the following setting for each project:
Allplan -> File menu -> ProjectPilot - Admin -> select the individual projects one after the other -> right mouse button -> Properties -> Settings tab
Set the path settings for &apos;Pen and line definitions&apos;, &apos;Fonts&apos;, &apos;Patterns, hatching styles, area styles&apos;, &apos;Bar and mesh cross-section catalogs&apos;, &apos;Layer structures, line styles, drawing types&apos; and &apos;Attributes proposed&apos; from &apos;Office&apos; to &apos;Project&apos;, if necessary.
The corresponding elements are copied from the office standard directly to the project. This ensures that the project settings stay the same even when you copy the project to the new server with the new office standard.

1.b: same folder name as project name
Open the &apos;General&apos; tab and select the &apos;Same folder name as project name&apos; setting if you want to proceed as described in 2b.

1.c: pen color ("Color stands for pen")
The pen color for the "Color stands for pen" setting is a user-specific setting that is not saved in the project but in the user folder (...\Usr).

2.a: backing up projects of the individual workstations and importing them to the main workstation (recommended method):
Back up the individual projects. To do this, open the Services application and select Data Backup -> Create -> Entire folders -> Projects.
You can back up several projects in a single operation.
Before you start, specify the backup folder on the network or on the local hard disk: Services application -> Configuration -> Backup path ->Browse for Folder.

The next step is to import the saved projects to the main workstation.To do this, open theServices application -> Data Backup -> Import -> Projects Before you import the individual projects, you can create new Allplan projects at the main computer. As an alternative, you can also create a new project during the import.

2.b: backing up projects of the individual workstations and importing them to the main workstation (special approach):
This approach should only be used with good reason for exceptional cases as it requires in-depth knowledge of Windows.
With this method, Windows Explorer is used to import the projects to the main workstation.
If some project names exist twice, you need to rename these projects before you back them up.

You can then rename the existing &apos;project.dat&apos; file in the Prj folder of the main workstation.
Next, select the Services application -> Service -> Hotline Tools -> reorg -> Restore project management file.
The system creates a new project administration file (project.dat), which should list all projects with names.

Now the main workstation contains the latest version of all the projects of the office.

3rd - merging project defaults
Open ProjectPilot at the individual workstations and copy the elements you want to transfer (symbols, smart symbols, lists, schedules, and so on) to the external path. Of course, you can set the external path to a common network folder that can be accessed by all workstations.
Next, open ProjectPilot at the main workstation and copy the contents of the external path to the office standard.

4th - data backup

  • Back up the projects, office standard and user settings at the main workstation:
    You can also copy the ..\prj (projects), ..\std (office standard) and ..\usr (user folder) paths to a backup folder (Nemsic, for example) on the hard disk.
  • In addition, you need to back up the ..\usr\local folder at every stand-alone computer.
  • Export the user interface setting of each user to a file: Allplan -> Tools - > Customize .... -> Export...


5th - uninstalling
Remove Allplan from all workstations.

6th - reinstalling
Before you install the same version again, create and share a folder (Nemdata, for example) on the future data server. Create a subfolder - Allplan - in this folder.

The next step is to reinstall the same version on all the workstations.

Specify the following installation paths:
Program folder:
local (C:\Programs\Nemetschek\Allplan, for example)
Central file storage folder:
Browse -> Network...
Find the sharedNemdata folder and select the Allplan folder.

After this, start installing.

7th - testing the start and restoring the backup
After the installation (check whether Allplan starts), copy the ..\prj and ..\std folders you backed up from the main workstation to the new ...\Nemdata\Allplan server folder.

Next, use Windows Explorer to copy the contents of the former user folder (…\usr\local) of the stand-alone workstation to the new user folder of the computer you just installed.

8th - updating the project administration file
Go to the project.datfile in the ...\Nemdata\Allplan\Prjfolder and rename itproject.alt.After this, do the following:
Services application -> Service -> Hotline Tools -> reorg -> Restore project management file.

9th - summary
Now all the workstations access a common network drive with the same project pool and office standard.
With this type of installation, only one user can access a project at any one time. If several users are to work on a project at the same time, you need to install Workgroup Manager.

Download PDF  FAQ_EN_Switching_from_single_installation_to_network...
Version:  Allplan 2021 / Allplan 2020 / Allplan 2019 / Allplan 2018  | Last modified: 30.09.2020
Not voted yet. Be the first to vote this FAQ as helpful!

Question:

You want to include a computer in the Allmenu via Workgroupmanager, but no network environment is displayed and no result appears when you enter the computer name in Search. How can the computer still be included?



Answer:

All computers included in the Workgroupmanager are stored in the data.cfg on the server in the central file storage request.
The Allmenu window shows the exact path of the "central file storage folder".

e.g. \\SERVER\data\Allplan
Go via Windows Explorer to the central file storage folder in the NET folder and open the file data.cfg (e.g. with the editor)

The content of the file looks like this
SERVER \data\Allplan

(So far no computer has been included and therefore there are no further entries in this example)

Here you can enter the new path of the computer to be recorded
Simply enter the computer name, spacebar, shared folder, subfolder as a new line.
Enter only your simple host name here, not the FQDN name (first name only, without periods and other additions)

Please make sure that all entries are flush with each other. Please do not remove the space bars in existing entries and also insert a space bar after the host name when entering, these are important.

So it looks like this

SERVER \data\Allplan
COMPUTERNAME \Nemdata\Allplan

Save the file.

As a result, the computers in the workgroup are displayed in the Allmenu/Services application under Workgroupmanager - > Administer projects and computers and can now be checked out.

Download PDF  FAQ_EN_Workgroupmanager_Adding_the_computer_is_not_p...
Version:  Allplan 2021 / Allplan 2020 / Allplan 2019  | Last modified: 05.11.2020
Not voted yet. Be the first to vote this FAQ as helpful!

Question:
How can I work together on a project with a partner from another country?

Answer:
Using Allplan 2019 and later, you can work on projects across countries.
You can define projects in a country-specific manner. This means that a project gets the resources (for example, hatching, patterns, layers and so on) and reinforcement settings of a specific country. Depending on your license, you can install one or more additional country packages. For example, you can then create a project with resources and settings for Germany and another one with resources and settings for the UK.


Requirements:

Whether you can use country packages depends on the Allplan license.

Only the ‘Cubed’ and ‘Exponential’ license types include country packages.
These license types enable you to use as many country packages as you like. You can create and open projects with any country code.

The ‘Lineared’ and ‘Squared’ license types only include one country package by default. This also applies to all conventional license types such as ‘Architecture’ and ‘Engineering’. In other words, you can only create and open projects with this country code.

Installing country packages:

When installing Allplan 2019 for the first time or upgrading from Allplan 2018 or earlier, you must explicitly install the additional country packages.

A default installation onlyinstalls the country package of your country. If you want to use different country packages, you must do a custom installation. Only a custom installation allows you to select the country packages you want to install.
You can do this whenever you want - be it the first installation or an upgrade or update.

Doing a custom installation:
Start Setup.

Select Customfor the Setup type.
When it comes to selecting Features, you can select the language packages you want to install.
You can see a list of all Allplan languages included in your license.
After this, you can select the countries. Select the country packages you want to install.
Click ‘Next’ to confirm all other dialog boxes.

Note:Please note that the more country packages you select, the longer the installation will take and the more hard disk space will be required.

Using country packages in Allplan:

You must define the country when you create a project. You cannot change the country later.

Creating a new project:
When creating a new project, you can select the county in country-specific templates.
Select the country and the template you need.

If you do not select a project template, you must select the required country in the next dialog box.


In the project:
The status bar shows the country set for a project.
The units for length entries and reinforcement set in the Options are project-specific settings. These units are preset depending on the country selected.



Important note:
  • When checking out a project in a workgroup environment, you can choose which country-specific office standard you want to check out.
  • Click in the ‘License Settings’ to see which countries are included in your license.
  • There is a default country, which is usually the country entered in your license. Setup always installs the data for this default country in the STD and ETC folders. During installation, Setup creates a STD.??? folder and an ETC.??? folder for each additionalcountry package selected (??? stands for the country code). The office path and default path are always based on the country set for the project that is currently open. That is to say, when you open a project and save a favorite or library element in the office path or default path, these elements will only be available in projects with the same country settings. ProjectPilot is an exception; here, the office path and default path always refer to the STD and ETC folders.


Download PDF  FAQ_EN_Country-specific_projects_-_working_together_...
Version:  Allplan 2018 / Allplan 2017 / Allplan 2016  | Last modified: 13.05.2020
1 user(s) found this FAQ helpful

Question:

The windows for options and the window for IFC import and export are closed immediately when opened. How can this issue be solved?



Answer:


1. HP computer

If you are using an HP (Hewlett-Packard) computer, please take these steps. Otherwise proceed to number 2.

Check whether the security software "HP ProtectTools" is installed on this computer. If yes, then uninstall "HP ProtectTools". This software suite consists of several progams. In most cases, these programs are:

  • HP ProtectTools Device Access Manager
  • Embedded Security for HP
  • Face Recognition for HP ProtectTools
  • File Sanitizer For HP ProtectTools
  • Privacy Manager for HP ProtectTools
  • Theft Recovery
  • Drive Encryption for HP ProtectTools
  • HP ProtectTools Security Manager



It is possible that more or less HP software than the listed is installed. When you uninstall the "HP ProtectTools Security Manager", no other dependent software should be listed during uninstallation.

If there is dependent software listed during uninstallation, please uninstall these programs first. As the last step, "HP ProtectTools Security Manager" should be uninstalled.

An example message, listing dependent software which is still installed:




Important notice: Please restart the computer to complete uninstalling the software.




2. Dell computer

If you are using a Dell computer, please take these steps. Otherwise contact the Allplan support.

Check whether the security software "Dell Data Protection" is installed on this computer. If yes, then uninstall "Dell Data Protection". This software suite consists of several progams. In most cases, these programs are:

  • Dell Data Protection | Security Tools Authentication
  • Dell Data Protection | Security Tools


It is possible that more or less Dell software than the listed is installed. When you uninstall the "Dell Data Protection", no other dependent software should be listed during uninstallation.

If there is dependent software listed during uninstallation, please uninstall these programs first. As the last step, "Dell Data Protection" should be uninstalled.

An example message, listing dependent software which is still installed:




Important notice: Please restart the computer to complete uninstalling the software.




Notes:

HP ProtectTools Security Suite was developed by McAfee in cooperation with HP. It is pre-installed on most HP business notebooks and on some HP desktop computers.

HP ProtectTools are using Full Volume Encryption (FVE) by McAfee Safeboot, which changes the Win32 API behaviour. This causes problems in Allplan.

Also Dell is using similar mechanisms for the Dell Data Protection Suite. They have the same influence on Allplan.

Please note that these programs in either case have negative effects on stability and functionality of Allplan, even if you might not notice it (example: working options and IFC windows in different Allplan version).


Download PDF  FAQ_EN_Options_window_IFC_window_closed_immediately_...
Version:  Allplan 2020 / Allplan 2019 / Allplan 2018 / Allplan 2017  | Last modified: 15.04.2020
Not voted yet. Be the first to vote this FAQ as helpful!

Question:

Can I "automate" the installation of Allplan?


Answer:

You can install Allplan 2017 in silent mode. This installation mode is fully automatic; you do not need to enter anything. Silent installation is particularly useful if you want to install Allplan 2017 with the same settings on a large number of workstations on a network.

Requirements for installing in silent mode:

Pay attention to the different licensing types!

Licensing for stand-alone workstations:
Make sure you have not yet activated a license on the computer where you want to record silent installation. Use the Viewer option for recording.

After having installed all computers in silent mode, you must use the Product Key to activate the license locally on each computer.
To activate the license after installation:

  • Open the &apos;License settings&apos; dialog box: Services application -> Utilities -> License settings
  • Click License activationon the left.
  • Enter your Product Key.
  • Click Activate license.


Using a license server:

  • The clients take the licenses from a license server.
  • The license server is installed.
  • The license of the license server is activated.

For more information on the license server, go to https://connect.allplan.com/en/faqid/20150618084450.html
Use the Use active licenseoption for recording.

Setup writes the license settings to the %AppData%\Nemetschek\Lic3.ini file.You must distribute this file to all computers.


Some more tips:

  • Before you start installing, unzip the Allplan installation package (for example, using the 7_Zip program). Make sure this package is in a folder that can be accessed by all clients you want to install.
  • Start the command prompt for running the setup program always as a local administrator. To do this, open the shortcut menu and select "Run as administrator". Make sure you always start the command prompt from the correct folder.
  • Setup will automatically install any Microsoft components required by Allplan such as Microsoft .NET-Framework or Microsoft Report Viewer without prompting you to confirm.




Preparing to install in silent mode

To record and run silent installation, you need the installation files of Allplan 2017.
Installing in silent mode involves three steps:

Creating the log file for installing in silent mode

Start by installing Allplan 2017 with the /r option on a typical workstation. During installation, Setup automatically writes all entries to a log file named setup.iss. You can then use this file to install the program on the other workstations.

Installing in silent mode

Next, install Allplan 2017 with the /s option on all other workstations. Installation is based on the setup.iss log file you created in the first step.

Checking the installation

Finally, you should check the setup.log file, which was created automatically during setup, to see whether everything was installed correctly.

Note: When installing in silent mode, Setup usually uses the same setup.iss file to install the program on all workstations. However, you can edit some settings of the setup.iss file if you want to adjust paths. You can find more information in the help; see Adjusting the setup.iss filehttp://help.allplan.com/Allplan/2017-0/1031/Allplan/index.htm#331.htm


To install Allplan in silent mode, do the following:

Install .NET 4.6
Silent setup requires you to install .NET 4.6 in advance. The reason for this is that you have to reboot the computer after installation of .NET 4.6. This reboot would interrupt silent installation.


After you have downloaded the installation files, you must unzip these files before you can use them to install in silent mode.

  • Unzip the zip file downloaded. This results in an .exe file (for example, Allplan 2017-0-5-cad.exe).
  • Then unzip this .exe file using an appropriate program (for example, 7_Zip) and save the resulting file to any folder. You can now use the command prompt to start Setup.exe for recording.



1. Sample installation:
Start by creating a record file. To do this, run setup with the settings you need. You only need to do this once.

Use the command prompt to start this installation with the "/r" option (for record):

To run the setup program, open the command prompt as a local administrator and type the following:
setup.exe /r

Setup starts and runs as usual.

Stand-alone license:
When you are prompted to choose the license configuration, select the Use vieweroption.
License server:
When you are prompted to choose the license configuration, select the Use active licenseoption.


Setup logs the entire installation process, writing everything to the setup.iss file.

If you want, you can change the name and folder of this file:

setup.exe /r /f1<folder>:\Setup.iss
For example,
setup.exe /r /f1c:\Setup.iss
This saves the file directly to C:\.

Be careful:
There must not be any blanks between "f1" and the folder!

Copy the setup.iss file to a folder that can be accessed by all clients you want to install. It is a good idea to copy this file to the folder with the Allplan installation files.

License server:
Copy the %AppData%\Nemetschek\Lic3.inifile to the %AppData%\Nemetschek folder of every client.
If you install Allplan on a client for the first time, you must create the Nemetschek folder in %AppData% first (for example, C:\Users\Username\Appdata\Roaming\Nemetschek).


2. Silent installation:
Make sure you can access the setup.iss file.

License server:
Make sure the Lic3.ini file is in the %AppData%\Nemetschek\ folder.


Setup logs the entire installation process again, writing everything to the setup.log file. You can find this file in the same folder as the setup.iss file. With the /f2 option, you can specify a different folder and file name for the setup.log file.

To start installing Allplan in silent mode on a client, open command prompt as a local administrator and type the following:

setup.exe /s /f1<folder>:\Setup.iss /f2<folder>:\Setup.log

For example,
setup.exe /s /f1c:\Setup.iss /f2c:\Setup.log
This saves the file directly to C:\.

Check the setup.log file to see whether everything has been installed correctly. The [ResponseResult] section should return the &apos;ResultCode=0&apos; value.



Note:

If you have several licenses or license servers, select the required license for each client using the Services application - Utilities - License settings.

Refer to the online help for detailed information on installing in silent mode.
http://help.allplan.com/Allplan/2017-0/1031/Allplan/index.htm#321.htm
To open the help system, press the F1 key during setup. Go to the "Contents" tab, select "Installing" and then "Installing in silent mode".

You can also find information in the help for the license settings:
Services application -> Utilities -> License settings
To open the help system, press the F1 key. Go to the "Contents" tab, select "Licensing Allplan using a license server" and then "Installing in silent mode".


Please note that we cannot provide support for this installation method.

Download PDF  FAQ_EN_Allplan_silent_installation_(Allplan_2017_and...
Version:  Allplan 2018 / Allplan 2017 / Allplan 2016 / Allplan 2015  | Last modified: 22.02.2018
Not voted yet. Be the first to vote this FAQ as helpful!

Question:

How can I copy bar reinforcement including views and sections created with the tools in the "Associative Views" module if, for example, I want to use slab reinforcement for another floor?
I want to place the copied reinforcement and the views in new, separate drawing files and then adjust the reinforcement, keeping the layout of the copied sections. Only the changes in the copied reinforcement should automatically be added to the sections.


Answer:

First, open ProjectPilot (File -> ProjectPilot) and copy the drawing files with the reinforcement and the drawing file with the associative views and sections to new drawing files. ProjectPilot asks you whether you want to copy the linked drawing files as well. Click No.

If there are views or sections containing only data you do not want to move (for example, only model data), select Create -> Engineering Views, Details -> Associative Views -> Add to Viewand add the data you want to move (for example, reinforcement) to these views or sections. You can remove the data later.


The copied drawing files still reference the original drawing files. The next step is to delete those references.

To do this, open the drawing files you just copied. Select Change -> Engineering Views, Details -> Associative Views -> Manage Reference Drawing Filesand remove the references to the source drawing files.



When you have removed all links to drawing files you do not want to move, select the new drawing files with the views and the reinforcement.


Select all data by pressing <CTRL>+A and move the data as you need.
You can move the data in the X, Y and Z directions in plan or define any spatial displacement in isometric view.

You can then add the associated model data to the views and adjust the reinforcement.

Note:

Once deleted, you cannot restore any references to drawing files. Therefore, make sure you delete the right references. Allplan deletes empty views or sections automatically.

Download PDF  FAQ_EN_Copying_reinforcement_with_associative_views_...
Version:  Allplan 2015 / Allplan 2014 / Allplan 2013  | Last modified: 14.02.2019
Not voted yet. Be the first to vote this FAQ as helpful!

Question:

Allplan starts as a viewer. What can I do?



Answer:

Do the following:

1. The Allplan license folder contains the servcfg.nse file.

Open this folder:
Services application -> Service -> Windows Explorer -> General program data (ETC, LIC) -> License.

Delete the servcfg.nse file from this folder.

2. Install the new, appropriate license, which you can find in the attached file. Save the license to a folder on your computer and install it as follows:
Services application -> Utilities -> License -> Install HARDLOCK License

3. Check that the light indicator of the connected USB dongle (blue or white stick) is on all the time. To test it, you can connect the dongle to a different port.

4. Install the current hardlock driver if the light indicator is off.
You can find detailed instructions here:

https://connect.allplan.com/en/faqid/20131028125253.html

5. Select the Services application -> Utilities -> License -> License settings -> Licenses.
Check if "Allplan FT" is displayed in the white window on the left. If this is so, Allplan has accepted the dongle.

If this is not so, send the logmes.nse file, info.001 file and the new servcfg.nse file (license folder) to support.de@allplan.com


Download PDF  FAQ_EN_First_steps_to_solving_hardlock_license_probl...
21 - 30 (58)
https://campus.allplan.com/ uses cookies  -  More information

Accept