I would like to generate quantity reports for plans, however I can't find the way to modify the tolerance.
If I determine a break-throught into slab smaller than 0,45x0,45m, the software doesn't count with it, like there would be no break-throughts there.
Is there any way to modify the punctuality of quantity reports?
Thanks,
Bálint