Why can’t I see anything in a project or why are elements missing from drawing files?
Why are layers not visible?
Why is it not possible to select a privilege set in layer selection?



Answer:

Probably, you have not yet been assigned any privilege sets or the layers are frozen in the privilege set in question. First, check whether you can select another privilege set.


1. Selecting another privilege set

To do this, select the project in question and open the layer settings(Format -> Select, Set Layers). Go to the “Privilege set in list box” area at the top on the right and check whether you can select another privilege set (for example, ALLPLAN).
By default, all layers have full access rights in the predefined ALLPLAN privilege set.

If there is no privilege set with full access rights, you should assign the privilege sets correctly.
This can only be done by a user with administrator privilegesor, in the case of a project-specific layer structure, by the project owner.

Thus, log on as a user with administrator privileges and do the following:


2. Assigning a privilege set

Select the project with the frozen layers.

Open the layer settings(Format -> Select, Set Layers). Switch to the "Privilege Set" tab and click Define, modify privilege set.

Select the relevant user and assign the privilege set using the arrows.

Click OKto confirm.


3. Adjusting layers’ access rights in the privilege set

Finally, check the access rights of the layers in the privilege set assigned.
Go to the "Privilege set in list box" area at the top on the right and select the relevant privilege set (for example, ALLPLAN).

Check the area on the left to see whether there are frozen layers (gray or white). To change this, select these layers or simply select all layers using CTRL+A. Then click the Full access right (modifiable)icon in the “Change rights” area.
Click OKto confirm.

The next time you open this project, you can select this privilege set in the layer settings. You can then see all layers and set them to modifiable.

Do the same with print sets.


Alternative:

Since version 2006, the administrator has been able to select Show all users all print sets and privilege setsin the “Administrator options” group on the “Privilege Set” tab (“Design group” in version 2006). Thus, you do not need to assign new users to privilege sets. This option applies to all projects.

However, as soon as a user has been given a privilege set or print set, this option no longer applies to this user.



Note:

As a project can have its own layer structure, it is essential that you check the privilege set in the correct project.
To find out whether a project has its own layer structure, click
File -> New Project, Open Project-> right-click the relevant project -> Properties. Check whether the path settings for Layerstructuresare set to Officeor Project.

Загрузка PDF  FAQ_EN_Enabling_privilege_set_for_user.pdf
Версия:  Allplan 2020 / Allplan 2019 / Allplan 2018 / Allplan 2017 / Allplan 2016 / Allplan 2015 / Allplan 2014 / Allplan 2013 / Allplan 2012  | Последнее изменение: 30.01.2020
1 user(s) found this FAQ helpful

Task:

You have installed Allplan on several local workstations. Now you want to change the installation so that you can access a common network drive.



Note:

Before you switch to a network installation, it is essential that you back up all the data of all the workstations.
We strongly recommend that you take advantage of the expertise of Nemetschek’s technical support staff. We are happy to help you!



Solution:

The following description shows how to change several workstations where Allplan is installed locally and the project data is also stored locally on each computer to workstations with a common network drive without Workgroup Manager.

1st - getting ready
Choose one of the workstations where you will install all the projects and the office standard (hereinafter referred to as the main workstation).
First, move all the projects to the main workstation.

1.a: copying resources into projects
To make sure that the projects in your office have a uniform appearance, change the path settings for the projects' resources to 'Project'.
Make the following setting for each project:
Allplan -> File menu -> ProjectPilot - Admin -> select the individual projects one after the other -> right mouse button -> Properties -> Settings tab
Set the path settings for 'Pen and line definitions', 'Fonts', 'Patterns, hatching styles, area styles', 'Bar and mesh cross-section catalogs', 'Layer structures, line styles, drawing types' and 'Attributes proposed' from 'Office' to 'Project', if necessary.
The corresponding elements are copied from the office standard directly to the project. This ensures that the project settings stay the same even when you copy the project to the new server with the new office standard.

1.b: same folder name as project name
Open the 'General' tab and select the 'Same folder name as project name' setting if you want to proceed as described in 2b.

1.c: pen color ("Color stands for pen")
The pen color for the "Color stands for pen" setting is a user-specific setting that is not saved in the project but in the user folder (...\Usr).

2.a: backing up projects of the individual workstations and importing them to the main workstation (recommended method):
Back up the individual projects. To do this, open the Services application and select Data Backup -> Create -> Entire folders -> Projects.
You can back up several projects in a single operation.
Before you start, specify the backup folder on the network or on the local hard disk: Services application -> Configuration -> Backup path ->Browse for Folder.

The next step is to import the saved projects to the main workstation.To do this, open theServices application -> Data Backup -> Import -> Projects Before you import the individual projects, you can create new Allplan projects at the main computer. As an alternative, you can also create a new project during the import.

2.b: backing up projects of the individual workstations and importing them to the main workstation (special approach):
This approach should only be used with good reason for exceptional cases as it requires in-depth knowledge of Windows.
With this method, Windows Explorer is used to import the projects to the main workstation.
If some project names exist twice, you need to rename these projects before you back them up.

You can then rename the existing 'project.dat' file in the Prj folder of the main workstation.
Next, select the Services application -> Service -> Hotline Tools -> reorg -> Restore project management file.
The system creates a new project administration file (project.dat), which should list all projects with names.

Now the main workstation contains the latest version of all the projects of the office.

3rd - merging project defaults
Open ProjectPilot at the individual workstations and copy the elements you want to transfer (symbols, smart symbols, lists, schedules, and so on) to the external path. Of course, you can set the external path to a common network folder that can be accessed by all workstations.
Next, open ProjectPilot at the main workstation and copy the contents of the external path to the office standard.

4th - data backup

  • Back up the projects, office standard and user settings at the main workstation:
    You can also copy the ..\prj (projects), ..\std (office standard) and ..\usr (user folder) paths to a backup folder (Nemsic, for example) on the hard disk.
  • In addition, you need to back up the ..\usr\local folder at every stand-alone computer.
  • Export the user interface setting of each user to a file: Allplan -> Tools - > Customize .... -> Export...


5th - uninstalling
Remove Allplan from all workstations.

6th - reinstalling
Before you install the same version again, create and share a folder (Nemdata, for example) on the future data server. Create a subfolder - Allplan - in this folder.

The next step is to reinstall the same version on all the workstations.

Specify the following installation paths:
Program folder:
local (C:\Programs\Nemetschek\Allplan, for example)
Central file storage folder:
Browse -> Network...
Find the sharedNemdata folder and select the Allplan folder.

After this, start installing.

7th - testing the start and restoring the backup
After the installation (check whether Allplan starts), copy the ..\prj and ..\std folders you backed up from the main workstation to the new ...\Nemdata\Allplan server folder.

Next, use Windows Explorer to copy the contents of the former user folder (…\usr\local) of the stand-alone workstation to the new user folder of the computer you just installed.

8th - updating the project administration file
Go to the project.datfile in the ...\Nemdata\Allplan\Prjfolder and rename itproject.alt.After this, do the following:
Services application -> Service -> Hotline Tools -> reorg -> Restore project management file.

9th - summary
Now all the workstations access a common network drive with the same project pool and office standard.
With this type of installation, only one user can access a project at any one time. If several users are to work on a project at the same time, you need to install Workgroup Manager.

Загрузка PDF  FAQ_EN_Switching_from_single_installation_to_network...
Версия:  Allplan 2013 / Allplan 2012 / Allplan 2011  | Последнее изменение: 11.12.2015
2 user(s) found this FAQ helpful

Question:

How can I use Allplan to create PDF documents (Portable Document Format) that can be opened and viewed using PDF viewers such as the free Acrobat Reader?



Answer:

You can export PDF files directly from Allplan.
In addition to the design, bitmap areas and text, the direct export tool transfers layers, OLE objects, transparency and gradients.
Of course, you can also use external programs such as Adobe PDF and FreePDF to create PDF files. However, these programs do not provide all the options mentioned above. For example, transparency is not transferred.

Allplan provides the following options for exporting PDF data:

1. using the layout editor:
Create -> Plot Layout -> Export PDF Data

2. using the print preview:
Click the Export PDF Data icon in the toolbar at the top

3. exporting 3D PDF files from the animation window:
You can create a PDF file from the animation window. This file contains the 3D model displayed in the animation window.
This option is not described any further in this FAQ.


General settings:

When exporting PDF data, you specify the file name in a dialog box, where you can also make basic settings for the PDF file:

  • Resolution (in dpi)
  • Document size (paper size (with margin) or printable area (without margin))
  • Entire layout content
  • Archiving format PDF/A 1a
  • Export layers
  • Embed TrueType fonts
  • ...
  • Add to file (first select an existing PDF file in this dialog box and then select this option -> the PDF file is attached as a new page to the existing file)
  • Grayscale (version 2011 and later)
  • Open file with associated application (should be selected. After you have created it, the PDF file automatically opens in this application so that you can check it.)



Note on the page format (new in Allplan 2011):

In Allplan 2011 and later versions, you set up a page in Allplan. The page size should be used as the size for the PDF file.
You need to exactly define the size you require for the page.

To use the page size for exporting the PDF file, select the following options:

  • Select 'Paper size (with margin)'.
  • Clear the 'Entire layout content' check box, if necessary.



Notes on 1. settings in the Plot Layout module:

You can make advanced settings in the "Plot Layouts" dialog box.
The following settings are used for exporting PDF data:

  • Plot elements / options (Selection tab)
  • Paper format and orientation (Output tab); see the above notes on the page format.
  • Resizing: Resizing factor, resize pen thickness and rotation by 90° (Settings tab)
  • Pen and color assignments... (Settings tab)
    -> Line thickness for monochrome output and line colors for color output
    -> Line display in color, black or using shades of gray (can only be changed when you select a color printer beforehand)
    -> Gamma correction
  • No pen optimization/ Use one pen only (number:)
  • Plot profile (Settings tab)




Notes on 2. settings in the print preview:

The PDF file is exported as it is currently displayed on screen.
You can make the settings that are used for the "Print" tool directly in the print preview (Display tab in the Print Preview Options).



Notes:

To export PDF data in color, you need to install a printer driver that supports color and select this driver in the layout before you start exporting the PDF data.
It is advisable to install a printer driver for a large-format color plotter such as an HP DesignJet even if your office is not equipped with a large-format printer/plotter.
[Install as a local printer/ without plug & play, port: FILE, do not share the printer, do not print a test page.]

Загрузка PDF  FAQ_EN_Creating_PDF_files.pdf
1 - 3 (3)
  • 1
https://campus.allplan.com/ uses cookies  -  More information

Accept