Version:  Allplan 2021 / Allplan 2020 / Allplan 2019 / Allplan 2018 / Allplan 2017 / Allplan 2016 / Allplan 2015 / Allplan 2014 / Allplan 2013 / Allplan 2012 / Allplan 2011  | Last modified: 05.10.2020
19 user(s) found this FAQ helpful

Question:

I just installed an upgrade. How can I convert all the projects at once?



Answer:

Back up all the projects beforehand!

Do the following:

  • Exit Allplan on all workstations.
  • Only when working with Workgroup Manager:
    Log in as the Allplan administrator (sysadm).
  • Start the Services application.
  • Only when working with Workgroup Manager:
    Make sure all the computers where projects are located are up and running.
    To check this, select:
    Services application -> Workgroup Manager -> Information -> Display Project List(the second column displays the computer where the project is located).
  • Go to the computer where you want to convert the data and set the drawing file size to the maximum value:
    Services application->Service ->Hotline Tools->docsize ->512 (or 1024, if available) ->OK
    Note:
    After data conversion, you can set the drawing file size back to the initial value.
  • Start converting the data (use the computer where you have changed the drawing file size):
    Services application ->Service ->Hotline Tools -> datwaprjs: convert data of all projects
    If you reply "Yes" at the following two prompts, the program will convert the data of all projects.



Notes:

The time it takes to convert the data depends on various factors:

  • Number of projects
  • Size of each project
  • Performance of the computer converting the data
  • Network performance


It is possible to start data conversion from several workstations at the same time.

Download PDF  FAQ_EN_Converting_all_Allplan_projects_in_a_single_o...
Version:  Allplan 2021 / Allplan 2020 / Allplan 2019 / Allplan 2018 / Allplan 2017 / Allplan 2016 / Allplan 2015 / Allplan 2014 / Allplan 2013  | Last modified: 12.11.2020
Not voted yet. Be the first to vote this FAQ as helpful!

Question:

Why does ProjectPilot open with the following error message:
"Unable to create ProjectPilot control. Is the registry correct?"



Answer:

The reason for this is usually an "external path" that no longer exists. When you start ProjectPilot,
the program tries to access the "external path", which is stored in the Windows Registry.
If this path no longer exists, you will see the above error message.

To correct this error, please do the following:

  • Services application
  • Service menu
  • Windows Explorer - CAD program folder
  • The path to the "User folder" is displayed in the window of the Services application. Open it in Windows Explorer.
  • Find the "extern.cfg"file in this user folder and delete this file.


Now try to start ProjectPilotagain. If the problem still occurs, please do the following:

Start the services application -> Service -> Windows Explorer -> CAD program folder.
Open the "PRG" folder.
Find the following file: "NemProjectPilot10.exe"
Right-click this file -> select "Run as administrator" on the shortcut menu.
ProjectPilot should now start.

Try to start ProjectPilotstraight from Allplan. If the problem is still not solved, please do the following:

  • Services application
  • Service menu
  • Windows Explorer - CAD program folder
  • The Allplan program folder opens.
  • Rename the "PRG" subfolder "PRG_OLD".
  • Start installing the program from the current Allplan DVD.
  • Select "Update installation".
  • Select "Current license file".
  • Set the setup type to "Minimum".


After installation try to start ProjectPilotagain.

Download PDF  FAQ_EN_Error_message_when_ProjectPilot_starts_Unable...
Version:  Allplan 2020 / Allplan 2019 / Allplan 2018 / Allplan 2017 / Allplan 2016 / Allplan 2015 / Allplan 2014 / Allplan 2013 / Allplan 2012  | Last modified: 30.01.2020
1 user(s) found this FAQ helpful

Task:

You have installed Allplan on several local workstations. Now you want to change the installation so that you can access a common network drive.



Note:

Before you switch to a network installation, it is essential that you back up all the data of all the workstations.
We strongly recommend that you take advantage of the expertise of Nemetschek’s technical support staff. We are happy to help you!



Solution:

The following description shows how to change several workstations where Allplan is installed locally and the project data is also stored locally on each computer to workstations with a common network drive without Workgroup Manager.

1st - getting ready
Choose one of the workstations where you will install all the projects and the office standard (hereinafter referred to as the main workstation).
First, move all the projects to the main workstation.

1.a: copying resources into projects
To make sure that the projects in your office have a uniform appearance, change the path settings for the projects' resources to 'Project'.
Make the following setting for each project:
Allplan -> File menu -> ProjectPilot - Admin -> select the individual projects one after the other -> right mouse button -> Properties -> Settings tab
Set the path settings for 'Pen and line definitions', 'Fonts', 'Patterns, hatching styles, area styles', 'Bar and mesh cross-section catalogs', 'Layer structures, line styles, drawing types' and 'Attributes proposed' from 'Office' to 'Project', if necessary.
The corresponding elements are copied from the office standard directly to the project. This ensures that the project settings stay the same even when you copy the project to the new server with the new office standard.

1.b: same folder name as project name
Open the 'General' tab and select the 'Same folder name as project name' setting if you want to proceed as described in 2b.

1.c: pen color ("Color stands for pen")
The pen color for the "Color stands for pen" setting is a user-specific setting that is not saved in the project but in the user folder (...\Usr).

2.a: backing up projects of the individual workstations and importing them to the main workstation (recommended method):
Back up the individual projects. To do this, open the Services application and select Data Backup -> Create -> Entire folders -> Projects.
You can back up several projects in a single operation.
Before you start, specify the backup folder on the network or on the local hard disk: Services application -> Configuration -> Backup path ->Browse for Folder.

The next step is to import the saved projects to the main workstation.To do this, open theServices application -> Data Backup -> Import -> Projects Before you import the individual projects, you can create new Allplan projects at the main computer. As an alternative, you can also create a new project during the import.

2.b: backing up projects of the individual workstations and importing them to the main workstation (special approach):
This approach should only be used with good reason for exceptional cases as it requires in-depth knowledge of Windows.
With this method, Windows Explorer is used to import the projects to the main workstation.
If some project names exist twice, you need to rename these projects before you back them up.

You can then rename the existing 'project.dat' file in the Prj folder of the main workstation.
Next, select the Services application -> Service -> Hotline Tools -> reorg -> Restore project management file.
The system creates a new project administration file (project.dat), which should list all projects with names.

Now the main workstation contains the latest version of all the projects of the office.

3rd - merging project defaults
Open ProjectPilot at the individual workstations and copy the elements you want to transfer (symbols, smart symbols, lists, schedules, and so on) to the external path. Of course, you can set the external path to a common network folder that can be accessed by all workstations.
Next, open ProjectPilot at the main workstation and copy the contents of the external path to the office standard.

4th - data backup

  • Back up the projects, office standard and user settings at the main workstation:
    You can also copy the ..\prj (projects), ..\std (office standard) and ..\usr (user folder) paths to a backup folder (Nemsic, for example) on the hard disk.
  • In addition, you need to back up the ..\usr\local folder at every stand-alone computer.
  • Export the user interface setting of each user to a file: Allplan -> Tools - > Customize .... -> Export...


5th - uninstalling
Remove Allplan from all workstations.

6th - reinstalling
Before you install the same version again, create and share a folder (Nemdata, for example) on the future data server. Create a subfolder - Allplan - in this folder.

The next step is to reinstall the same version on all the workstations.

Specify the following installation paths:
Program folder:
local (C:\Programs\Nemetschek\Allplan, for example)
Central file storage folder:
Browse -> Network...
Find the sharedNemdata folder and select the Allplan folder.

After this, start installing.

7th - testing the start and restoring the backup
After the installation (check whether Allplan starts), copy the ..\prj and ..\std folders you backed up from the main workstation to the new ...\Nemdata\Allplan server folder.

Next, use Windows Explorer to copy the contents of the former user folder (…\usr\local) of the stand-alone workstation to the new user folder of the computer you just installed.

8th - updating the project administration file
Go to the project.datfile in the ...\Nemdata\Allplan\Prjfolder and rename itproject.alt.After this, do the following:
Services application -> Service -> Hotline Tools -> reorg -> Restore project management file.

9th - summary
Now all the workstations access a common network drive with the same project pool and office standard.
With this type of installation, only one user can access a project at any one time. If several users are to work on a project at the same time, you need to install Workgroup Manager.

Download PDF  FAQ_EN_Switching_from_single_installation_to_network...
Version:  Allplan 2021 / Allplan 2020 / Allplan 2019 / Allplan 2018 / Allplan 2017 / Allplan 2016 / Allplan 2015 / Allplan 2014  | Last modified: 30.09.2020
1 user(s) found this FAQ helpful

Task:

Several users require Allplan administrator privileges in an installation with Workgroup Manager.



Note:

There are normal users and Allplan administrators in Allplan installations with Workgroup Manager.
Allplan administrators are:

  • Windows users with any login name who are granted administrative rights in the Workgroup Manager administration.

In other words, a Windows user with Windows administrator privileges does not necessarily have to be an Allplan administrator at the same time.

We do not recommend that several users work with Allplan administrator privileges at the same time, making it difficult to manage and protect the office standard, that is, the global settings. See solution 1.

However, if it is essential that several users are Allplan administrators, see solution 2.


Solution 1:

There is one Allplan administrator and normal Allplan users.

As the owner of a project has advanced rights in this project, you can define a user as the owner in a project and set the required resources to 'project'.
File -> New Project, Open Project... -> right-click the project you need -> Properties ... -> Path settings
Set the required resources to project.
You can also make these settings when you create a project or in ProjectPilot.

In addition to the Allplan administrator, another user (the owner of the project) can now define settings in the project.

Notes:

  • There are two standards for the definitions set to project: office and project.
  • It is only the Allplan administrator who can make changes in the office standard.



Solution 2:

Windows users with any login name are set up as Allplan administrators.


First, set up the Windows user as an Allplan user.
Services application -> Workgroup Manager -> Administrate users -> right-click->Create user

For the "user name", you can enter any Allplan user name, which can be up to 8 characters long.
For the "Windows user name", you must enter the name the user uses for login.
Important: If the user uses a domain for login, you must add it to the "Windows user name", for example, DOMAIN\user.

Grant the administration privilege to the "user group":
select "Administrator"on the dropdown menu. Using this approach, you can also assign the administration privilege to existing users.

Important: Click "Apply" and then "OK" to close the dialog box and the user overview, respectively.

Download PDF  FAQ_EN_Several_users_with_Allplan_administrator_priv...
Version:  Allplan 2020 / Allplan 2019 / Allplan 2018  | Last modified: 27.12.2019
Not voted yet. Be the first to vote this FAQ as helpful!

Question:

What are the reasons why I cannot modify the format properties (pen thickness, color, ...) of elements in a DWG/DXF file I have just imported?



Answer:

There are four reasons why these elements cannot be modified.

1st -the elements are smart symbols:

  • To retain the smart symbols but still be able to modify the elements, select Modify -> Bonus Tools -> Smart Symbols -> Modify Smart Symbol(until V2006: Modify -> Bonus Tools -> Smart Symbols -> Modify Display Parameters) and click the relevant element. Now you can modify it (using Modify Format Properties, for example). For more detailed information on how to modify smart symbols, please contact us.
  • If you do not want to retain the smart symbol, you can also resolve it: Modify -> Bonus Tools -> Smart Symbols -> Unlink Smart Symbol, select the smart symbol(s) you want to resolve and click the right mouse button to confirm.
  • To resolve the smart symbols during import, select the file to be imported, click the"Options..."button,open the "Advanced Settings" tab (until Allplan 2008 "Advanced Transfer Settings")and select the"Smart symbol"check box in the"Explode elements" area. To confirm the dialog box, click OKand open the file.


2nd - theelements are composite elements:

  • To explode a composite element, select Modify -> Advanced Draft -> Explode Composite Element. Select the composite element(s).
  • To resolve the composite elements during import, select the file to be imported, click the "Options..." button, open the"Advanced Settings" tab" (until Allplan 2008: "Advanced Transfer Settings") andselect the "Composite elements"check box in the"Explode compounds" area. To confirm the dialog box, click OKand open the file.


3rd - the elements are on frozen layers:

  • To modify these elements, you first have to set the corresponding layers to modifiable. Open the layer selection by clickingFormat -> Select, Set Layers.On theSelect Layer/Visibilitytab, set all the layers to modifiable.


4th - the elements have the "from layer" format property:

  • To find this out, click an element with the right mouse button and selectFormat Propertieson the shortcut menu: pen thickness, line type or line color is not available for elements with the "from layer" format property.
  • To modify the format properties of the layer, select Format -> Select, Set Layers and open the'Format Definition' tab. Check that the''Match from layer based on line style, pen, line, color assigned (fixed setting)"optionis selected in the"Layers' format properties" area. Next, select the layer on which the element resides and change its format properties.
  • To remove this property, clickEdit -> Modify Format Properties, select the"Change 'from layer' for pen, line and color" option(pen thickness, line type and line color must not be selected) and select the elements.
  • To resolve the "from layer" property during import, select the file to be imported, click the "Options..." button, open the"Advanced Settings" tab" (until Allplan 2008: "Advanced Transfer Settings") andselect the "From layer"check box in the"Explode compounds" area. To confirm the dialog box, click OKand open the file.




Note:

If you have any further questions regarding data exchange, this topic is described in detail in the online Help. All you need to do is press the F1 key. Open the Index tab and selectInterfaces.

Download PDF  FAQ_EN_Elements_cannot_be_modified_after_import.pdf ...
Version:  Allplan 2013 / Allplan 2012 / Allplan 2011 / Allplan 2009  | Last modified: 30.11.2017
Not voted yet. Be the first to vote this FAQ as helpful!

Question:

How can I output a test plot with different data types used in Allplan?



Solution:

Allplan comes with drawing files containing test data that can be used for this purpose.

If necessary, create a new project and copy the drawing files with the test data to this new project.

Open ProjectPilot: Allplan -> File -> ProjectPilot - Admin.

Set the external path to the '..\New\Testplot' folder, which is a subfolder of the local Allplan program folder.
Click 'External path' with the right mouse button and, on the shortcut menu, choose 'Select external path'.
Select the '..\New\Testplot' folder, which is a subfolder of the local Allplan program folder: c:\Programs\Nemetschek\Allplan\New\Testplot, for example.

The following layouts and drawing files are available:

  • Layout 1 - Test Plot Allplan Testbild / Allplan Test Layout
  • Layout 2 - Test Plot Muster & Schaffur / Patterns & Hatching
  • Layout 3 - Test Plot Allplan Testbild / Allplan Test Layout
  • Drawing file 25 - Füllflächen + Stifte / Fills + Pens
  • Drawing file 26 - Muster / Patterns (Version 2006 and later)
  • Drawing file 27 - Schraffuren / Hatching (Version 2006 and later)
  • Drawing file 100 - Allplan Test Drawing File (Version 2008 and later)


Copy these layouts and drawing files to the new project.
Select the relevant drawing files with the right mouse button and choose 'Copy to ...' on the shortcut menu.
Select the new project.

If necessary, create a layout, place the drawing files in this layout, specify an output device and and print the layout.

Note:

Make the following settings to ensure that the data is output correctly:

  • Select "white" for the background color.
  • Turn off "Color stands for pen" in "Show/Hide".
  • Turn off "Surface elements in background of each document" on the "Selection" tab of "Plot Layouts".
  • Use Windows drivers for printing.
  • For HP plotters, select the "Avoid out of memory condition" or "Output as a bitmap" option in the plotter properties.
  • For optimum color output with sRGB values, apply the settings described in the FAQ entitled Color adjustment - Windows drivers and Nemetschek vector drivers.
    https://connect.allplan.com/en/faqid/0001a106.html



Notes:

Colors in printouts can vary depending on several factors such as

  • Output device used
  • Paper used
  • Ink used
  • Driver type used (Windows or Nemetschek drivers)

In particular, colors can differ regarding

  • Color display
  • Brightness


Colors in printouts can even vary if you use the same output device but different Windows drivers.
On-screen display can be influenced by various factors such as different settings for contrast and color temperature.

As the possible settings are so widespread, you can see that it is essential to print out test data in advance.

Download PDF  FAQ_EN_Printing_test_plots.pdf
1 - 6 (6)
  • 1
https://campus.allplan.com/ uses cookies  -  More information

Accept